Danish-Polish Environmental Co-operation 1991-2000 Enclosure 4
|
Priority Areas |
Environmental Effect |
Unit |
1991 - 2000 |
||
|
|
|
Actual |
Estimated |
Total |
Ordinary waste |
Reduction of waste volumes |
t/y |
32 |
30.000 |
30.032 |
|
Establishment of deposits |
T |
- |
230.000 |
230.000 |
|
Treated soil |
m3 |
- |
3.000 |
3.000 |
Hazardous waste |
Incineration capacity |
t/y |
- |
1.500 |
1.500 |
|
Energy production Other |
t/y |
- |
64 |
64 |
|
Carbon dioxide CO2 |
t/y |
1.930 |
12.473 |
14.403 |
|
Nitrogen oxide Nox |
t/y |
5.305 |
43 |
5.348 |
|
Sulphur dioxide SO2 |
t/y |
110.044 |
179 |
110.223 |
|
Dust/particulates |
t/y |
85.430 |
27 |
85.547 |
Industry |
Other |
t/y |
4 |
- |
4 |
|
Carbon dioxide CO2 |
t/y |
63 |
- |
63 |
|
Nitrogen oxide Nox |
t/y |
20 |
- |
20 |
|
Sulphur oxide SO2 |
t/y |
17 |
- |
17 |
|
Dust /particulates |
t/y |
101 |
- |
101 |
|
Solvents |
t/y |
7 |
- |
7 |
Industrial wastewater |
Reduction |
m3/y |
154.000 |
28.000 |
182.000 |
|
Reduction of heavy metals |
t/y |
14 |
- |
14 |
|
Reduction of oxygen demand (COD) |
t/y |
453 |
- |
453 |
|
Reduction of oxygen demand (BOD) |
t/y |
- |
60 |
60 |
|
Wastewater Reduction of phosphorous (P) |
t/y |
295 |
1.473 |
1.768 |
|
Reduction of nitrogen (N) |
t/y |
911 |
6.557 |
7.468 |
|
Reduction of oxygen demand (BOD) |
t/y |
12.391 |
24.173 |
36.564 |
|
Sludge treatment capacity, dry solids |
t/y |
20.000 |
54.110 |
74.110 |
Environmental friendly energy |
Other |
t/y |
65 |
- |
65 |
|
Carbon dioxideCO2 |
t/y |
282.085 |
117.870 |
399.955 |
|
Nitrogen oxide NOx |
t/y |
1.067 |
348 |
1.415 |
|
Sulphur dioxide SO2 |
t/y |
2.391 |
1.224 |
36.15 |
|
Dust/particulates |
t/y |
865 |
400 |
1.265 |
Nature protection |
Rehabilitation of water course |
Km |
- |
9.000 |
9.000 |
|
Nature protection |
Ha |
725.000 |
- |
725.000 |
Drinking water/ Groundwater |
Water saving |
m3/y |
800 |
2.400.000 |
2.400.800 |
|
Volume of water |
m3/y |
9.125.000 |
- |
9.125.000 |
Prevention of oil pollution |
Reduction of oil pollution |
t/y |
- |
4.000 |
4.000 |
Estimated effect: as estimated in project application (on-going projects) actual effect: as measured/calculated after project implementation (completed projects)