    In the years to come large amounts of money will be invested in renovation
    and sewer renewal with a view to improve the environmental
    state of the ground water. The purpose of this project is to help assuring that the sewer
    renewal will be completed with concern for the environment, and that the choice of
    materials, systems, disposal etc. are made on the basis of an overall technical-,
    economical- and environmental assessment. 
    The present work report forms part of a succession of work reports under phase 2 of
    the frame project Environmental Management in Project Design. 
    The aim of the project is to promote the application of cleaner technologies in
    building- and construction projects through a development of standard methods for
    environmental management in project design. 
    Testing of practical use of the methods established in a guide to "Environmental
    Management in Project Design" (Håndbog i Miljørigtig Projektering) and
    participation in further development of these methods has been the main aims of the
    partial project. The partial project was implemented in connection with a sewer renovation
    project. 
    Elucidation of different sewer renovation methods and on the basis of selection of
    materials and systems regarding an actual location in Herning Municipality has formed a
    secondary aim of the project. 
    The methodology of Environmental Management in Project Design is based on an overall
    assessment of environmental-, health- and resource impacts and environmental effects
    during the plants life span from recovery of raw materials to final disposal. The
    environmental aspect involves parameters such as functioning, aesthetics, quality,
    technology, and economy. 
    The project embraces two levels: A general level covering sewer renovation in general,
    and a rather specific level relating to the location in question. 
    On the basis of surveys, an environmental programme and an environmental plan for sewer
    renovation as part of the environmental measures in Herning Municipality have been
    established. Further, a general environmental policy and general environmental objectives
    for sewer renovation have been determined in close co-operation with Herning Municipality.
    Based on this Herning Municipality has identified a number of co-ordinate environmental
    impacts, which are considered principal: 
        | Energy consumption and work environment in connection with production of goods |  
        | Consumption of raw material resources  |  
        | Energy consumption in connection with the construction phase |  
        | Work environment and inconvenience to the citizens in connection which the construction
        phase  |  
        | Re-use of materials in connection with the construction phase  |  
        | Sewage load on receiving waters |  
     
    Life span and disposability / re-use of sewage pipes form a constituent part of the
    priorities.  
    The project has been finalised in proper interaction between client and consultant,
    according to which the environmental policy and ends for sewer renovation established by
    Herning Municipality has formed the basis of the consultants contributions to
    environmental management in project design. The project has been instrumental in Herning
    Municipalitys incorporation of environmental management in project design into the
    municipal action plan on sewer renovation. 
    Likewise, the drawing up of environmental requirements has been accomplished in
    co-operation with Herning Municipality and the local section of the Danish
    Contractors Association. The tender documents lay down the actual requirements to
    the contractors environmental management procedures and documentation hereof, the
    environmental requirements in connection with the work performance as well as the delivery
    quality. Incorporation of environmental requirements in the tender documents will form
    part of a current development implying presumably progressive environmental requirements. 
    Experience gained from the project shows the necessity of availability of sufficient
    environmental data with regards to materials and methods: 
    Spreading of environmental management in project design demands simple, intelligible,
    and operational methods. Eventually, it must be stressed that assistance from
    environmental experts bearing on each individual project is highly important. 
    Author/ institution 
    Nellemann, Nielsen & Rauschenberger A/S, Herning Kommune 
    This report is subsidised by the National Council for Recycling and Cleaner Technology 
    ISSN no. 0908-9195 
    ISBN no. 87-7810-768-7 
      