Cleaner Technology Projects in Denmark 1997
Miljørigtig projektering af Aalborg Tekniske Skole
Arbejdsrapport nr. 28, 1997, Miljøstyrelsen
The present demonstration project on environmental management in project design is
about the extension of Aalborg Technical College. The project is part of the building
project phases called "project proposal" and "master project". The aim
of the project is to gain experience within method development as well as testing in the
field.
The building project comprises erection of a new wing (approx. 5,800 m2) of Aalborg
Technical College. The new wing is connected with existing buildings situated at Øster
Uttrup Vej 1 in Aalborg.
The leading principle of the project is to allot to the colleges users a healthy teaching environment and a healthy indoor climate conditioned that the solution is optimised as
to the environment.
The prerequisites of the projects take into consideration the actual economic frames
and time limits of the project.
First of all a general inventory of a schoolhouse was prepared. This inventory was
supplemented with existing experience as to life cycle assessments (LCA) of building
activities and building materials. Moreover, the building programme and the
architects proposal were scrutinised together with the master proposal and the local
conditions.
Concerning resource consumption and emissions from building materials it is generally
assessed that extraction/production and operation and (up to a point) the disposal out is
the phases above all contributing to the environmental impacts. With regards to materials
e.g. cement, asphalt, concrete, plaster, and steel constructions have turned out to be
amongst the building materials that lead to the highest waste of resources and energy
consumption.
The Title number at Øster Uttrup Vej is very suitable for a schoolhouse as the
character of the building site and its surroundings limit the possible applications of the
site.
When scrutinising the building programme of the project the functional demands are
crucial. Wishes and demands to the building as to resources and the environment are stated
in brevity and in general outlines. When considering the pros and cons of the building
proposals, economic conditions are taken into account together with the architectonic
manifestations.
The architects proposal integrates the environmental aspect in the architectonic
manifestations rather than in proportion to the substance cycle as suggested in the
building programme.
On the basis of the general inventory and the clients conditions a gross list was
drawn up in order to itemise the environmental management in project design.
The prioritisation of environmental impacts was accomplished on the basis of the
clients preferences, in particular in proportion to the operating phase that is
worded in the environmental policy. Moreover, the possibilities of the master project as
to degrees of freedom of the building project have been considered. Orderisation of
priorities has taken place in consultation with the client, consultants, and the
architect.
The targets that have been put in order of priority embrace spheres that the client
wants to be scrutinised thoroughly, namely:
| Drawing up of environmental targets, a.o. in relation to impacts on the surroundings
during the building phase. |
| Utilisation of daylight instead of artificial light. |
| Utilisation of natural ventilation. |
| Visible registration and measurement of resource consumption during operation. |
| Selections of environmentally sound internal surfaces. |
| Environmental inventory of selection and design of heat distribution system. |
| Life cycle assessment of the weather screen. |
| Environmental assessment of the project proposal. |
| Preparation of plan for environmental targets stated in the tender material. |
A number of possible means supplement the targets. Accordingly an environmental
activity plan has been prepared. The activity plan describes in detail how each individual
investigation is to be accomplished.
The environmental inventories described in the environmental activity plan are
accomplished during the master project phase. The environmental inventories are based on
experience and scrutiny of scientific literature. The inventories have brought about
several proposals and recommendations as to means such as selection of materials,
construction principles, surfaces, installations, organisation etc. Means have been
presented to the client, consultants, and the architect.
Below is stated an example of environmental targets in tender material. The targets
concentrate on minimum requirements as to the contractors environmental management
and documentation hereof and on supply of environmental information regarding selected
materials and components. The example has been put before the client and the architect.
Decisions on a possible more advanced environmental inventory and embodying of
environmental targets into the tender material have rested with the client. In due course
they were to be accomplished under the auspices of the building project and in compliance
with the existing narrow economic framework.
Author/ institution
Nelle, Nielsen & Rauschenberger A/S
Aalborg Technical College
This report is subsidised by the National Council for Recycling and Cleaner
Production
ISSN no. 0908-9195
ISBN no. 87-7810-770-9