| Contents |
Strategic Anslysis of the environment-related challenges of Romania, 2003
Romanias Road to Accession - The Need for an Environmental Focus
Table of Contents
In December 2002, the European Council in Copenhagen concluded negotiations for the
biggest enlargement in the history of the European Union. On the first of May 2004, the 15
current Member States will be joined by ten of the 13 candidate countries,1 which will bring 75 million new citizens into
the European Union.
The European Council reaffirmed the irreversibility of the accession process for
Romania and Bulgaria and confirmed the objective to grant them membership in 2007. The
Council recognised their progress in meeting the accession criteria so far, but underlined
also that major reforms still needed to be implemented. A roadmap put forward by the
European Commission just before the Council provides Bulgaria and Romania with clearly
identified objectives and gives both countries the possibility of setting their own pace
of accession. Furthermore, The European Council stressed the importance of the countries
stepping up their preparation, including ensuring that the Copenhagen criteria are met,2 and implementing the commitments undertaken
so far.
This strategic report looks at the situation of Romania. At this stage of the
enlargement process and after the renewal of the EU commitment to Romania, it is important
to ensure that Romanias own quest for accession does not lose momentum. This will
require Romania to devote more attention than ever to the serious environmental problems
it faces, including to strengthen the governments ability at national, regional and
local levels to meet the administrative and investment challenges in the environment
sector.
Denmark has provided significant support to both Bulgaria and Romania in the area of
environment, aimed at assisting them to solve their most urgent environmental problems and
to build the environmental management structures needed to implement the EU environmental
requirements.3 Under the Government
Strategy on Support to Eastern Europe 2002, Danish bilateral assistance to the CEE
applicant countries will cease in 2004 when they have been accepted as members. For the
intervening period until the end of 2003, Danish assistance is to focus on enabling the
applicant countries to achieve the requirements of EU membership, including in the
environment sector.
The purpose of this report is to identify the key problem areas and challenges related
to the EU environmental acquis that Romania will need to address in order to stay
on track for accession by 2007. It reviews the priority actions and assistance needed by
Romania to succeed in the accession process. Finally, it considers the measures that
should be taken in the near future to maintain Romanias pace in carrying out the
reforms, investments and capacity building required to meet the obligations of EU
membership.
The aim is to identify the major pre-accession challenges which Romania faces today in
the environment sector, as a possible guide for future actions by the Romanian Government
and other donors.
The contents of this report have been requested by the Romanian environmental
authorites in the co-operation with the Danish Ministry of the Environment as a
rounding-off of the Danish-Romanian efforts. The purpose of the report is to illustrate
the status of the environment and indicate possible solutions to the problems.
1. |
The ten countries which will join are Hungary, Poland, Czech
Republic, Slovakia, Estonia, Latvia, Lithuania, Slovenia, Cyprus and Malta.
|
2. |
The Copenhagen criteria require for EU membership that the
candidate country must achieve: (1) stability of institutions guaranteeing democracy, the
rule of law, human rights and respect for and protection of minorities; (2) the existence
of a functioning market economy as well as the capacity to cope with competitive pressure
and market forces within the Union; and (3) the ability to take on the obligations of
membership including adherence to the aims of political, economic and monetary union.
Also, the candidate must have created the conditions for its integration through the
adjustment of its administrative structures, so that European Community legislation
transposed into national legislation is implemented effectively through appropriate
administrative and judicial structures.
|
3. |
From 1993 to 2001 Denmark has provided support to 76 projects
in Romania for a total value of 34 MEUR |
Enlargement negotiations were formally opened on 31 March 1998 with the so-called
Luxembourg group of countries - Estonia, Poland, Czech Republic, Hungary, Slovenia and
Cyprus.4 Following strong pressure from
the remaining countries, it was agreed at the December 1999 European Council in Helsinki
to take a more flexible, multi-speed approach to enlargement and to admit all of the
candidate countries to negotiations.5 Formal
negotiations were then opened on 15 February 2000 with the Helsinki Group, i.e., Bulgaria,
Latvia, Lithuania, Romania, Slovakia and Malta.
2.1 The Process of Negotiating Accession
Accession negotiations are carried out individually with each country, on
the basis of a thorough screening of the acquis (as divided in 31 chapters based on
different policy sectors). During the screenings, the applicant countries are asked:
 | if they accept the targeted chapter |
 | if they intend to request transitional periods after accession for achieving compliance |
 | if national legislation fully complies with the acquis (if not, target dates for full
compliance) |
 | if administrative structures are able to implement the acquis (if not, target
dates for completing administrative framework) |
A chapter is provisionally closed when the EU is satisfied that the applicant country
can effectively meet the obligations therein at the time of accession or within an agreed
transition period. The EU has agreed to consider transitional periods if the applicant
countries will not be able to comply fully with the requirements of the respective
legislation on the day of EU membership, e.g., where financially heavy investment will be
required or where immediate compliance would have unacceptable social implications. The
table on the next page provides an overview of the status of accession negotiations as of
December 2002.
The main sticking points in the last sprint for accession were the chapters on
agriculture, financial and budgetary provisions, and institutions. The agriculture chapter
negotiations opened up tensions between those Member States that are currently receiving
large net benefits from subsidies and direct payments under the existing Common
Agricultural Policy (CAP) and those candidate countries who were initially told that their
farmers would not enjoy such generous subsidies for the initial period after accession.6 Nonetheless, the outcome of the European
Council in Copenhagen was a tailor-made package which satisfied the applicants
concerns, including a rural development package of 5.1 billion EUR for 2004-2006, direct
aids for farmers to be phased in over ten years starting with 25% of the full EU rate in
2004, 30% in 2005, and 35% in 2006, as well as full and immediate access to CAP market
measures (e.g., export refunds).
The financial and budgetary provisions chapter determines what each Member State (and
soon-to-be Member States) will pay into the EU budget. Although negotiations of this
particular chapter lasted until the very last minute of the Copenhagen summit, negotiators
of the applicant countries went back home with the EU commitment to allocate a total of
40.9 billion EUR during the first two years of membership. Computations put on the
negotiating table in September 2002 indicated that a few of the candidate countries might
initially pay more into the EU budget than they would receive in benefits.7 While the new Member States would be eligible
for higher amounts of aid from EU agricultural and regional subsidy payments, these funds
would not be available until after the new Member States would be required to start paying
into the EU budget.8 In light of this
reasoning, the Copenhagen Council decided to provide prospective members with an
additional package of 987 MEUR for temporary budget compensation during the period
2004-2006. In addition, a special cash flow facility amounting to 2.4 billion EUR is to be
allocated during the same period of time.
Table on Accession Negotiations (European Commission website)
20 December 2002
No. |
Chapter |
CYP |
CZ |
EST |
HUN |
POL |
SLO |
BUL |
LAT |
LIT |
MAL |
ROM |
SLK |
1 |
Free movement of goods |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
***0 |
X |
2 |
Free movement of persons |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
***0 |
X |
3 |
Free movement of services |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
****0 |
X |
4 |
Free movement of capital |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
*0 |
X |
5 |
Company law |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
6 |
Compe- tition |
X |
X |
X |
X |
X |
X |
*0 |
X |
X |
X |
0 |
X |
7 |
Agri- culture |
X |
X |
X |
X |
X |
X |
***0 |
X |
X |
X |
****0 |
X |
8 |
Fisheries |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
9 |
Transport |
X |
X |
X |
X |
X |
X |
*0 |
X |
X |
X |
*0 |
X |
10 |
Taxation |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
**0 |
X |
11 |
EMU |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
12 |
Statistics |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
13 |
Social Policy |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
14 |
Energy |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
***0 |
X |
15 |
Industry |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
16 |
SMEs |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
17 |
Science & Research |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
18 |
Education & Training |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
19 |
Tele- commu- nication |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
20 |
Culture and audio- visual |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
21 |
Regional Policy |
X |
X |
X |
X |
X |
X |
**0 |
X |
X |
X |
***0 |
X |
22 |
Environ- ment |
X |
X |
X |
X |
X |
X |
**0 |
X |
X |
X |
***0 |
X |
23 |
Con- sumers & Health Protection |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
24 |
Justice & Home Affairs |
X |
X |
X |
X |
X |
X |
*0 |
X |
X |
X |
***0 |
X |
25 |
Customs Union |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
26 |
External Relations |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
27 |
CFSP |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
28 |
Financial Control |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
***0 |
X |
29 |
Financial & Budgetary provisions |
X |
X |
X |
X |
X |
X |
**0 |
X |
X |
X |
****0 |
X |
30 |
Insti- tutions |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
31 |
Other |
X |
X |
X |
X |
X |
X |
~ |
X |
X |
X |
~ |
X |
Chapters opened |
31 |
31 |
31 |
31 |
31 |
31 |
30 |
31 |
31 |
31 |
30 |
31 |
Chapters closed |
31 |
31 |
31 |
31 |
31 |
31 |
23 |
31 |
31 |
31 |
16 |
31 |
|
|
0: |
Chapters opened, under negotiation |
X: |
Chapter provisionally closed |
*: |
Chapter opened to negotiations under the Swedish
Presidency (First semester 2001) |
**: |
Chapter opened to negotiations under the Belgian
Presidency (Second semester 2001) |
***: |
Chapter opened to negotiations under the Spanish
Presidency (First semester 2002) |
****: |
Chapter opened to negotiations under the Danish
Presidency (Second semester 2002) |
~: |
Chapter not yet opened to negotiation |
Provisional closure of the institutional chapter resulted in a EU commitment that acceding
States will be able to participate in the 2004 European Parliament elections and that
commissioners from the new Member States will join the current Commission as from the day
of accession on 1 May 2004. A new Commission should take office in November 2004, the date
on which the provisions contained in the Nice Treaty concerning the Commission and voting
in the Council will enter into force.
Nonetheless, the chapter on institutions cannot be fully decided before the EU Member
States agree on how to reform the EU governance framework so that it can cope with ten new
Member States. The various issues at stake are being discussed in working groups in the
context of the Convention on the Future of Europe, which has been working since 2001 on a
draft European constitution. The first outline for a European constitution was released on
28 October 2002.9
The first section describes the EU as "a Union of European States which, while
retaining their national identities, closely co-ordinate their policies at European level,
and administer certain common competen-cies on a federal basis". The draft suggests
that a President be appointed to run the European Council and act as the unions
driving force and figure head. It also proposes creation of a Congress of the Peoples of
Europe a body of national and European members of Parliament to confirm the
appointment of the President and to review the state of the union. The draft notes an
intention to set out clearly defined areas of exclusive EU competence, areas where
competencies are shared between the EU and Member States and areas of national competency.
Areas to be clarified include the size of the European Commission, whether the European
Parliament should have one or two chambers, and the number of official languages in an
enlarged EU, so it is not clear how the draft constitution will reform the EU
institutions. Target date for finalisation of the constitution is summer 2003, when the
next Intergovernmental Conference (IGC) will take place.10 The new Member States will participate fully in this IGC,
and Romania and Bulgaria have been granted an observer status.
Much remains to be done before accession effectively takes place in spring 2004. The
text of the Accession Treaty, a 6,000-page tome, will need to be finalised and agreed by
all parties. It will need European Parliament approval and unanimous decision by the
Council of Ministers.11 The Accession
Treaty will be signed by the fifteen Member States and the ten Member States-to-be in
Athens Acropolis on 16 April 2003.
After signature, the Treaty will be submitted for ratification by all 25 States in
accordance with their respective constitutional requirements. It is envisaged that for all
Candidate Countries, except Cyprus, referenda will take place. Hungarys referendum
is the first one scheduled in April 2003, followed by Slovakia, Poland and the Czech
Republic before the summer starts. The European Commission will be monitoring the interim
period to provide further guidance to the acceding states and to make sure that they are
indeed carrying out all the promises made during negotiations. In addition, safeguard
clauses to be attached to the Accession Treaty will provide for measures to deal with
unforeseen developments that may arise during the first three years of accession.
2.2 Romanias Negotiations with the EU and Public Support for Accession
In 1974, Romania became the first country of Central and Eastern Europe to open
official relations with the European Community, when an agreement including Romania in the
Communitys Generalized System of Preferences was signed. Formal diplomatic relations
between Romania and the European Union were opened in 1990, after the demise of communism
in Romania.
Romania became party to a Trade and Co-operation Agreement with the EU in 1991 and its
Europe Agreement with the EU entered into force in 1995. The Europe Agreements started the
enlargement process and covered trade, political dialogue, commitment to legal
approximation, and co-operation in fields of industry, environment, transport and customs.
On 22 June 1995, Romania submitted its formal application for EU membership. Four years
later, in the Commissions Regular Report of 1999 on Romanias Progress Towards
Accession, the Commission recommended the commencement of accession negotiations with
Romania.12
The EU started formal accession negotiations with Romania in February 2000. In 2001,
the EU drew up an Accession Partnership for Romania and all the other candidate countries,
outlining the priority actions to be taken by each candidate country, for programming of
EU financial assistance for implementation.
By the end of 2001, Romania had provisionally closed negotiations on nine of the 31
chapters of the acquis. By November 2002, Romania had closed a further 6 chapters.
This leaves Romania with 16 chapters still to negotiate including Chapter 22 on
Environment.
On 13 November 2002, the European Commission issued a new road-map for Romania13; one month later the European Council
in Copenhagen endorsed the document. The roadmap aims to support the 200714 target date for accession by identifying
short and medium term benchmarks against which Romanias progress can be monitored,
and by providing increased financial assistance from the date of the first round of
accessions. It will be updated periodically according to new developments and progress in
negotiations, including any new issue that may arise in the revised Accession Partnerships
to be adopted in 2003.
There is strong support for enlargement in Romania. In March 2002, the
Commissions first Eurobarometer report on the candidate countries showed that 78% of
Romanians surveyed thought accession would bring advantages to their country.15 In July 2002, another poll revealed that, if
a referendum on joining the EU was to be held then, 76% of those interviewed would vote
favourably, and only 4% said they would vote against accession.16
Romanians image of the EU
(from March 2002 Eurobarometer Survey
2.3 The Environment Chapter in the Accession Negotiations
The environmental acquis communautaire are considered among the most difficult
of any of the Chapters to implement. Formal opening of negotiations of the Environment
Chapter took place for the front running applicant countries towards the end of 2000. In
March 2001, Slovenia became the first applicant country to close provisional negotiations
on the Environment Chapter. By the end of 2001, eight of the candidate countries had
provisionally closed their Environment Chapter negotiations. Malta was the most recent
country to provisionally close the Environment Chapter on 30 September 2002, while
Bulgaria and Romania are still in negotiations.
A chapter is provisionally closed only when the EU considers that a candidate country
understands the obligations and investments needed and has a plan for carrying out all
that is required. If a transitional period after the date of accession is requested, the
plan must give details on the actions that will be taken in order to achieve compliance by
the end of the extra time period, including how such actions will be financed.
Concerning transition periods for the environmental acquis, DG Environment has
signalled the following acceptable and non-acceptable positions:
a) |
Acceptable: urban wastewater treatment and large combustion
plant requirements |
b) |
Negotiable: packaging waste and industrial pollution
prevention and control (IPPC) requirements |
c) |
Unacceptable: all framework Directives (e.g., air quality,
waste and hazardous waste framework, radiation protection), nature protection, access to
information, environment impact assessment |
The table below provides the transition periods that have been agreed to date with those
candidate countries that have provisionally closed the Environment Chapter.
Transition periods agreed at provisional closure of Environment Chapter
Sector/- Directive |
CY |
CZ |
EE |
HU |
LT |
LV |
MT |
PL |
SK |
SLO |
Water |
|
|
|
|
|
|
|
|
|
|
- Urban wastewater treat |
2012 |
2010 |
2010 |
2015 |
2009 |
2015 |
2007 |
2015 |
2015 |
2015 |
- Drinking water |
|
|
2013 |
|
|
2015 |
2005 |
|
|
|
- Dange-
rous substances |
|
|
|
|
|
|
2007 |
2007 |
2006 |
|
Waste |
|
|
|
|
|
|
|
|
|
|
- Landfill |
|
|
20092 |
|
|
2004 |
|
2012 |
|
|
- Packaging |
2005 |
2005 |
|
2005 |
2006 |
2007 |
2007 |
20073 |
2007 |
2007 |
- Incine-
ration of Hazardous waste/ municipal waste (old) |
|
|
|
|
|
|
|
|
|
2006 |
- Shipment of waste |
|
|
|
|
|
|
|
|
2012 |
|
Air quality |
|
|
|
|
|
|
|
|
|
|
- VOCs Stage I |
|
|
2006 |
|
|
2008 |
2009 |
2005 |
2007 |
|
- Sulphur content of fuel |
2004 |
|
|
|
2007 |
|
|
2006 |
|
|
Industrial pollution |
|
|
|
|
|
|
|
|
|
|
- Lg Combustion Plants |
SP |
20071 |
|
2004 |
|
|
2005 |
|
2007 |
|
- IPPC |
|
2012 |
|
|
|
|
|
2010 |
2007 |
2011 |
Nature |
|
|
|
|
|
|
|
|
|
|
- Wild Birds |
|
|
|
|
|
|
2008 |
|
|
|
Chemicals |
|
|
|
|
|
|
|
|
|
|
- Asbestos |
|
|
|
|
|
2004 |
|
|
|
|
Radiation Protection |
|
|
|
|
|
|
|
|
|
|
- Medical Exposures |
|
|
|
|
|
2005 |
|
2006 |
|
|
|
|
1 |
Special Provisions mean that Cyprus has been given a
special emissions level for emissions of sulphur dioxide from its boilers at the Dhekelia
and Vasilikos combustion plants. |
2 |
Oil shale only (hazardous waste). |
3 |
For certain types of waste the period could be extended
after accession to 2012. |
Requests for transitional measures need to be justified by detailed implementation plans
ensuring that compliance with the acquis will be reached over time. These plans
also allow Candidate Countries to define intermediate targets which will be legally
binding. Transitional requests will become Annexes to the Accession Treaty and will be
closely monitored upon accession. Hence, transitional measures aim to allow the future
Member States to deal with the legacy of the past but do not allow efforts to attract new
investments with lower environmental standards.
2.4 Romanias Negotiating Challenge in the Environment Sector
Romania was the last CEE candidate country to open negotiations on the Environment
Chapter in March 2002. The Ministry of Waters and Environmental Protection (MWEP) has lead
responsibility for negotiation of this chapter. The position paper prepared by the MWEP
for these negotiations assumes an accession date of 1 January 2007 as a working hypothesis
for finalising its preparations for EU accession. It has pledged to implement the
environmental acquis communautaire by that date, except for the following
Directives, for which it has requested transition periods.
Transition periods requested by Romania in environment sector
Sector |
Directive |
Transition period
requested |
Air quality |
Control of VOC Emissions during Storage
& Distribution (94/63/EC) |
2010 (3 years) |
Waste management |
Packaging Waste (94/62/EC)
Landfill (99/31/EC)
Waste Incineration (2000/76/EC) |
2010 (3 years)
2017 (10 years)
2010 (3 years) |
Water quality |
Urban Wastewater Treatment (91/271/EC)
Drinking Water (98/83/EC)
Dangerous Substances Discharged into the Aquatic Environment (76/464/EEC)
Nitrates Pollution (91/676/EEC) |
2022 (15 years)
2022 (15 years)
2015 (8 years)
2014 (7 years) |
Industrial pollution control & risk
management |
Integrated Pollution Prevention &
Control Directive (IPPC) (96/61/EC)
Solvents (99/13/EC)
Large Combustion Plant (88/609/EEC, as amended by 2001/80/EC) |
2015 (8 years)
2015 (8 years)
2012 (5 years) |
The information the MWEP has submitted for these transitional period requests has not yet
satisfied the Commission. It has given the MWEP a deadline of October 2003 to submit
additional information on its plans for effective enforcement of the acquis and for
institutional development of the national, regional and local administrative structures
for environmental management. Within that time period, the MWEP must also prepare clear
implementation plans including financing strategies for all Directives where there may be
delays in implementation, with a possibility of revision of some transition periods. This
will require compilation of inventories of the investment projects, estimates of costs,
and realistic plans for financing and construction of infrastructure.
In response to the EUs request for further information, the MWEP is currently
preparing a Complementary Position Paper for Environmental Protection, to be finished in
October 2003. It expects to reach provisional closure of the Environment Chapter sometime
in 2004.
In the meantime, the MWEP has set the ambitious goal for itself of completing legal
transposition for all environmental acquis, as the stood at 2000, by the end of
2003, and to complete a process of setting in place the necessary administrative
structures to be able to demonstrate preparedness for implementation and readiness
for accession as early as possible. Such a goal is intended to meet the short-term
benchmarks laid out in the Commissions roadmap, which emphasise the need to focus on
developing implementation capacities (including increasing human resources at local level
and developing implementation plans together with financing strategies via a coherent
legislative procedure.
2.5 EU Assistance for Accession
The European Community finances three pre-accession instruments to assist the CEE
candidate countries in their pre-accession preparations.
The PHARE Programme, which has an annual budget of 1,560 MEUR, aids the candidate
countries by providing technical assistance, often in the form of twinning programmes
involving Member State officials with specific administrative experience, and by investing
in the more impoverished regions of applicant countries. The SAPARD programme, in
contrast, finances agricultural and rural development, and can sometimes be used to
finance certain types of environmental measures for rural communities. ISPA the
Instrument for Structural Policies for Pre-accession splits its annual budget of
1,040 MEUR 50/50 between major environmental projects and transport infrastructure
projects.
During the eight-year period 19921999, the PHARE programme provided approximately
1.2 billion EUR of assistance to Romania an average of 150 MEUR a year. In the
three-year period 2000-2002 the total financial assistance available to Romania amounted
to some 260 MEUR from PHARE, 150 MEUR from SAPARD, and between 208 and 270 MEUR from ISPA
an average of 220 MEUR a year. The new roadmap for Romania indicates that this
amount should increase progressively from 2004 to reach the level of an additional 40% in
2006. However, such an increase will be conditional on making progress as set out in the
roadmaps and on ensuring sufficient absorptive capacity to effectively use the funds. The
Accession Partnerships will continue to be the basis for programming pre-accession
assistance, but will need to be complemented with the priorities established in the
roadmaps, Regular Reports and revised National Development Plans.
The EU also provides other sources of assistance. DG Enlargements TAIEX
Directorate provides technical assistance and advice on transposition, implementation and
enforcement of the acquis through expert missions, seminars and workshops. The current
2000-2004 phase of LIFE, the Financial Instrument for the Environment, has a budget of 640
million EUR which it uses for co-financing environmental initiatives within the EU and
candidate countries including Romania. Lastly, there is the TEMPUS programme aimed
specifically at the higher education sector. Institutions from existing Member States are
paired up with institutions in a partner country to assist the institutions in their
modernisa-tion through a project-structured relationship.
Since 1999, the Commission has been working with the candidate countries to assist them
to move towards decentralised implementation, approval for project selection, tendering
and contracting by Candidate Countries of PHARE and ISPA projects. To help the Candidate
Countries prepare for taking on full responsibility and liability for the management of
all Community assistance, an Extended Decentralised Implementation System is currently
being prepared (EDIS).17 Under this
system, all responsibility for procedural management of EU funds will be passed over to
the candidate countrys implementing agencies once a country has set in place the
necessary financial accountability systems and the Commission is satisfied that Community
funds will be handled appropriately. At this point the Commissions role will change
from ex-anteapproval of projects to that of general monitoring and ex-post evaluation of
selected projects.
Implementation of SAPARD has been decentralised from the start of the programme in
2000. Bulgaria was the first country to receive approval for SAPARD implementation.
Romania received approval in July 2002.
The final aim of such process is to prepare the Candidate Countries to effectively
manage larger funds, such as the Structural and Cohesion funds, under the final monitoring
and auditing of the Commissions services.
The EDIS process is going very slowly for all candidate countries and none have
qualified to date. The candidate countries have been set the deadline of the end of 2002
for implementing EDIS. Romania has designed an action plan to meet the EDIS requirements
"Strengthening Institutional and Administrative Capacity to manage EU
funds", and this plan has been approved by the Government. According to the
Commissions strategy report 2002 the work on getting this system put in place should
be accelerated.18
Romania has a large task ahead if it is to meet the EDIS criteria. While the EU
provides technical assistance and financial support, there are many conditions attached
including technical hurdles before the funding can be accessed. This means that Romania
has difficulty in absorbing all of the EUs help. The flexibility of bilateral
assistance is invaluable support for Romania to meet the various conditions attached to EU
assistance, e.g. preparation of documentation for infrastructure projects.
4. |
The decision that some of the CEE applicant countries had
achieved sufficient progress in meeting the basic requirements of a democratic political
system, a functioning market economy and ability to assume the obligations of EU
membership to begin negotiations towards eventual membership was taken in late 1997 at the
European Council in Lux-emburg, after the July 1997 publication of the European
Commissions policy document, Agenda 2000.
|
5. |
The European Council in Helsinki also confirmed the status of
Turkey as an applicant country.
|
6. |
"Newcomers will receive less regional aid", by Judy
Dempsey and Michael Mann, Financial Times, 28 January 2002.
|
7. |
Direct benefits of EU membership are expected to include a
considerable increase in EU assistance through Structural and Cohesion Funds, and other
programmes.
|
8. |
"EU: Study Finds Easterners May Be Net Payers into
Budget" by Breffni ORourke in Radio Free Europe, 26 March 2002.
|
9. |
For the draft Constitution see
http://european-convention.eu.int/docs/sessplen/00369.en2.pdf.
|
10. |
"A Constitution for a Europe of Elites", Financial
Times, 6 November 2002, p15.
|
11. |
Article 49 of the EU Treaty establishes the procedure for EU
membership including an unanimous decision from the Council after consulting the
Commission and after receiving the assent of the European Parliament, which shall act by
an absolute majority of its component members.
|
12. |
The Commissions Regular Report of 1999 on Romania
provided that the start of accession negotiations was conditional upon the improvement of
the situation of children in institutional care and the drafting of a medium-term economic
strategy.
|
13. |
Roadmaps for Bulgaria and Romania, Communication from the
Commission to the Council and the European Parliament, 13 November 2002, COM (2002) 624
final.
|
14. |
Romania has set the year 2007 as its indicative date for
accession; this decision was endorsed by the European Council in Copenhagen on 12-13
December 2002.
|
15. |
"First Eurobarometer report on candidate countries
published", Commission Press Release, DN: IP/02/426, 18 March 2002.
|
16. |
"IMAS: Over three fourths of Romanians would vote for
countrys accession to the EU", Institute of Marketing and Public Opinion Polls,
16 July 2002.
|
17. |
Co-ordination Regulation 1266/99 on co-ordinating aid to the
applicant countries in the framework of the pre-accession strategy and amending Council
Regulation 3906/89/EEC as amended.
|
18. |
"Towards the Enlarged Union. Strategy Paper and Report
of the European Commission on the progress towards accession by each of the candidate
countries", Brussels, 9 October 2002, COM (2002) 700 final, at page 29. |
For the purposes of approximation, the European Commission has subdivided the
environmental acquis communautaire by sector. This section looks at the status of
approximation in Romania for the major environmental sectors covered by the acquis. Each
sectors section starts with a sketch of the actual situation, and then reviews the
measures in place and still needed in order to achieve compliance by the date of
accession.
Concerning legal transposition, the MWEP has set itself the ambitious goal of
completing the adaptation of Romanias legal framework to the EU requirements by the
end of 2003. Its lawyers and technical specialists are working to draft the necessary
legislation and supplementary administrative regulations, and to get these drafts through
the legislative process within the MWEPs self-imposed deadline. Some outside
observers are concerned that the transposition process is outpacing Romanias
capacity to set in place the necessary administrative structures and systems for setting
the requirements into practice. Moreover, the road-map for Romania reveals significant
concern regarding the lack of realistic deadlines and cost assessments to implement
effectively the vast bulk of newly adopted legislation. The sections below pay special
attention to this concern.
This sector includes a number of administrative requirements that cut across all
environmental topics, such as public access to environmental information and environmental
impact assessment (EIA) of proposed development projects. In its negotiations with the
candidate countries, the EU has placed great emphasis on the need to set these procedures
in place as quickly as possible, not least of all because EIA with public participation is
a fundamental pre-condition for eligibility of infrastructure projects for EU funding.
The MWEP considers approximation with EU obligations in this area as a short-term
priority19 to be achieved between
2002-2004. Similarly, the recent roadmap for accession has explicitly established as a
short-term benchmark the need to adopt secondary legislation on environmental impact
assessment and access to information, and to improve public consultation with all relevant
stake holders at different stages of the legislative process. The Emergency Governmental
Ordinance No. 91/2002 amending the 1995 Environmental Protection Law provides the
legislative framework to enable subsequent regulatory acts for implementation of the EU
requirements in this sector.
Romania was one of the first countries to ratify the 1998 UNECE Convention on
Access to Information, Public Participation and Access to Justice in Environmental Matters
(Aarhus Convention), via Law No. 86/2000. Moreover, it ratified the UNECE Convention on
Environmental Impact Assessment in a Transboundary Context (Espoo Convention) in March
2001.
The MWEP completed transposition of the EU access to environmental information
requirements by a Governmental Decision on Free Access to Environmental Information.20 The GD lays out a schedule for completing an
inventory of environmental information and the public authorities holding such information
(by October 2002) and for its publication (by November 2002), but as of February 2003, the
inventory had not yet been completed.
Since 1996, the MWEP, in co-operation with ICIM,21 has prepared an annual Report on the State of the
Environment, which is published at the MWEP web site (www.mappm.ro) and linked through
EIONET at the European Environment Agency. The 2001 Report is available on-line, but only
in Romanian. In addition, each of the 42 county-level Environmental Protection
Inspectorates (EPIs) publishes an annual report based on local data.22
Responsibility for the implementation of a 2001 Public Communication Strategy on
dissemination of environmental information rests with the MWEPs Directorate for
Public Relations and the Public Relations, Mass Media, Local and International Programmes
within the 42 EPIs. However, the MWEP has only limited human resources for these tasks (6
persons at central level, and one person at each EPI) and is seeking to increase the
current staff.
A fully EU-compliant EIA procedure was established in 2002 via a Governmental Decision
on Procedure for Environmental Impact Assessment.23
The MWEP issues permits for major projects and for international and transboundary
projects, while smaller projects fall under the responsibility of the county-level EPIs.
The existing EIA system is managed by the Directorate for Permitting and Certification
within the MWEP and the Agreements, Permits, and Notification Offices within the EPIs.
However, again the human resources are limited (10 persons at central level, of which 5
are directly involved in approving the EIA, and an average of 5 persons in each EPI); the
MWEP has applied for additional budget in the hope that it can double staffing in this
area by early 2003.
The new system aims to ensure public participation at different stages of the EIA
procedures. Citizens are initially notified via local press and public notices at EPI
premises, and given the opportunity to comment on the EIA or environmental audit report.
However, the public participation procedure does not yet fully work in Romania. Current
EIA meetings are too often a one-way process of information sharing, limited to provision
of technical and often complicated information to the public, rather than vehicles for
fostering a genuine public debate on an intended project. A Handbook on Public
Participation in EIA Procedures, issued by the NGO Ecosens, and a PHARE 2000 technical
assistance project are expected to assist in implementation of the EIA Directive. The
PHARE project will include a guide on the EIA process, campaigns for greater awareness and
understanding of the EIA requirements, and training.
Transposition of the newer EU requirement on strategic environmental assessment (SEA)
of plans and programmes has started, but implementation will not be fully in place before
2004. Structures for public participation at central level are also lacking, e.g., interministerial
working groups for adoption of legislation or approval of environmental pro-grammes do not
include civil society representatives. On the other hand, civil society is very involved
at local level. Romanias Local Agenda 21 programme24 establishes a structure for drawing up local environmental
action plans (LEAPs) with the involvement of representatives from local businesses, the
local administration and civil society.25
Major challenges for the
horizontal sector
 | How to improve administrative capacity at central and local
level for managing horizontal requirements, e.g., through increasing number of staff and
ensuring adequate training
|
 | Building of additional support for a strong environmental protection
regime through inter alia public campaigns for environmental awareness and
participation
|
 | How to ensure stronger public participation in central-level
decision-making concerning environmental protection as well as in the environmental impact
assessment process, and for projects and plans with potential environmental impact (SEA)
|
|
The EU requirements with respect to industrial pollution control pose some of the
biggest challenges to Romania, because of Romanias historically large base of
industrial installations, most of which date back to the 1980s and earlier. Use of old
production equipment with poor operating efficiency results in poor performance in
comparison to Western European standards. The non-ferrous metallurgical facility at Copsa
Mica, for example, emits high levels of SO2, lead and cadmium for kilo-metres
around. The severe environmental contamination has led to major public health problems,
including congenital malformations or dysfunction in more than 50% of the local children
born today.
Yet many local economies, including that of Copsa Mica, are highly dependent on the
jobs provided by their industrial resource base, and the social costs that would be
incurred by closing these polluting facilities are considered unacceptably high.
In recognition of the massive (mostly private sector) investment needed to reduce
environmental impacts from its industries, the Romanian government has requested the
following transition periods for this sector:
Integrated Pollution Prevention &
Control Directive (IPPC) (96/61/EC) |
2015 (8 years) |
Solvents Directive (99/13/EC) |
2015 (8 years) |
Large Combustion Plant Directive
(88/609/EEC, as amended by 2001/80/EC) |
2012 (5 years) |
Romanias negotiation position for approximating this sector foresees complete
transposition by the end of 2003. The MWEP plans a significant training effort to be sure
that the competent authorities understand the measures needed to implement the legal
provisions, which will enter into force by the end of 2005. Existing industrial activities
will have ten years (2006 2015) to achieve compliance with the new provisions.
Activities and installations that are not able to comply by 2015 will then be closed.
The European Commissions 2002 Regular Report noted the extensive work still
needed for implementation of EU requirements for this sector. The key EU requirement is
the Integrated Pollution Prevention and Control (IPPC) Directive,26 which requires major industrial
installations to have an integrated permit covering impacts on all environmental media
(water, air, waste), with emission limit values based on best available techniques (BAT).
A preliminary inventory carried out in 1999 found 873 industrial installations subject to
IPPC requirements, of which 728 were currently in operation. The inventory did not include
food production, animal farms and landfills. After carrying out a second inventory in
2002, the MWEP determined the number of installations to be closer to 2900, i.e., some
70 installations for each of Romanias 42 Environmental Protection Inspectorates
(EPIs) to handle.
This is an environmental management challenge for which few of the EPIs are prepared.
Under the permitting procedure established in Romanias 1995 Environmental Framework
Law, the MWEP issues permits for activities of national importance and investments
involving more than one county, e.g., hazardous and radioactive waste disposal, large
industrial plants, while the 42 county-level EPIs issue the remaining permits. An
environmental impact assessment is needed before a permit can be issued and the basic
procedure requires public consultation. The requirements of the permits are established by
the EPIs on a case-by-case basis, and are not based on the EU standard of best available
techniques (BAT).
But a large number of activities are subject to permitting requirements, and the lack
of staff at the county-level EPIs has resulted in most applications being processed
without adequate evaluation of the potential environmental impacts. As of 1999, most
industrial activities coming within the IPPC Directive still operated without a permit,
and of those that did have permits, only 20% complied with permit conditions.27 Thus the system does not yet correspond to
the EU requirements.
The IPPC Directive will place significant new demands on the MWEP and the county-level
EPI officials responsible for permitting and enforcement, because it requires complex
judgements about the tradeoffs between emissions to different environmental media and the
process options for each plant. The EPIs lack capacity for the time- and
resource-consuming process of making installation-specific determinations of best
available techniques (BAT)28, and there
is no central-level source of information on BAT to provide technical guidance for a
particular installation. On the other hand, each EPI has staff with expertise on different
types of installations and the various environmental media, which could provide a
knowledge base of expertise for integrated permitting.
In March 2002, Romania adopted an Emergency Governmental Ordinance on integrated
pollution prevention and control (IPPC)29 requiring
all facilities subject to its provisions to ask for an evaluation, and to begin integrated
permitting in January 2003. Six months after the ordinance was published, no facilities
had asked for this evaluation, and the MWEP had not yet issued guidance on how the
competent authorities will issue permits.
The MWEP plans to establish a five-person unit on industrial pollution control and
integrated permitting within the Directorate for Ecological Control and Monitoring, and to
augment each EPI with an additional 3 to 7 employees for integrated permitting, depending
on the number of IPPC installations in the respective area. However, as of October 2002
government funds for these additional positions had not yet been allocated.
Though additional technical assistance for implementing the IPPC Directive is foreseen
under the PHARE 2001 programme, the tight timeschedules established by Romanias
transposing legislation and the formidable technical challenges posed by integrated
permitting may require technical assistance support and major capital investment for years
to come. One option for Romania would be to establish a list of priority sectors for
phasing in integrated permitting, perhaps starting with thermal power plants, chemical
facilities, refineries, and metallurgical facilities. Each of these sectors already has a
professional association and a research institute in place, which would facilitate the
process of implementation. In that vein, the MWEP in co-operation with the Cement
Industry Owners Association - is currently involved in a pilot project for implementation
of BAT in the cement industry supported by the Danish Ministry of Environment, and it also
co-operates with the NGO Ecosens to establish a Pollution Release and Transfer Register
(PRTR) in accordance with IPPC requirements.
The EU requirements on dangerous substances discharged to water30 were transposed by a 2002 Governmental
Decision, but implementation is still in the initial stages. Since most of the substances
were not previously monitored in Romania, the MWEP is working on an inventory of the
industrial facilities currently discharging dangerous substances into water, and plans to
issue an additional order concerning methods for measuring and analysing their
concentrations in waters by the end of 2002. National Company Romanian Waters ("Apele
Romane") is in process of getting its laboratories accredited and modernised to meet
the EU standards for monitoring these substances in watercourses. By the end of 2005, the
MWEP plans to establish intermediate emission limit values based on the technological and
financial capacity of specific industries, and the impact of dangerous substances
discharges on water quality. This effort will need to be closely co-ordinated with the
introduction of integrated permitting under the IPPC requirements.
The Large Combustion Plant Directive31 covers
thermal power plants and large industrial boilers generating over 50 mega watt (MW). The
MWEP plans to develop a "National Plan for gradual limitation of emissions". It
is currently updating its inventory of installations subject to this directive (the 1999
baseline study identified 67 large combustion plants (LCPs) in Romania), analysing
emissions for installations subject to the directive for the reference year 1989 and for
the year 2001, and assessing costs for implementation on a "case by case "
basis. The LCP Directive has recently been amended to require even older LCPs to be
upgraded to meet stringent requirements.
Transposition of the Solvents Directive32 and
the Seveso II (Major Accident Hazards) Directive33
will be completed by the end of 2002 via Government Decisions.34 The MWEP plans for implementation of the
Seveso II Directive include setting up a Risk Secretariat employing 5 persons by 2003,
to establish the procedures, perform risk assessments and reporting of major accidents to
the EU. Each EPI is expected to have correspondent units for relevant activities,
including drawing up a more complete inventory of the plants subject to the
Directives provisions and elaboration of internal and external emergency plans.
The Convention on the transboundary effects of industrial accidents (Helsinki) is also
going to be ratified by the end of this year. A PHARE 2002 Twinning project with Germany
as the primary partner will assist in developing an implementation strategy for the Seveso
II, Solvents and LCP Directives. The objectives of this project include elaborating a plan
for emissions reduction as well as a National Register of Pollutant Emissions.
The administrative challenges of this sector will require a concentrated effort from
the MWEP and the EPIs for the next several years until initial permits are in place. But
the even bigger challenge will be to work with Romanian industry to ensure the necessary
investments to achieve BAT and clean up Romanias burden of past pollution.
Major challenges for the industrial pollution
control sector
 | Securing the additional budgetary resources to establish the
5-person unit on integrated pollution prevention and control within the MWEP and to add
additional skilled personnel at the local EPIs, for carrying out integrated permitting
|
 | Meeting the tight statutory schedule for beginning the process of
integrated permitting, and for carrying out the assessments on which the integrated
permits will be based, which may require setting of priorities among industrial sectors
and phasing in integrated permitting on that basis
|
 | Ensuring that Romanian industrial facilities subject to the IPPC
requirements receive adequate information on best available techniques (BAT), perhaps by
establishing a central BAT resource centre and a network for distributing BAT information
|
 | How to build capacity in integrated permitting, within industries as
well as the EPIs
|
 | How to provide industries with appropriate financial incentives to
make the necessary investments in technologies and pollution control measures to comply
with BAT
|
|
EU water legislation covers a wide range of issues and is expected to be among the most
difficult and expensive of the EU requirements to implement. Romania has much work to do
in this sector.
The 1990s saw a reduction in the total quantity of water consumption because of
diminished industrial activity and the introduction of technologies using less water.
Despite this, there can still be insufficiencies of water supply for important parts of
the country because of the unequal spread of water resources, frequent droughts, the lack
of regulari-sation of river flows and the pollution of many rivers.
Out of approximately 22.4 million inhabitants only 65% (14.7 million persons) have
drinkable water supplied by public service.35
Romanias water distribution is uneven and water interruptions in the city of
Bucharest still occur.
Two hundred and six municipal waste water treatment plants currently operate in
Romania, but the general level of treatment is low with only 77% of the total flow of
public sewerage being treated, and only 18% treated to EU standards.36
The investment needed to comply with EU standards on drinking water and urban
wastewater treatment will strain Romanias national budget for years to come. In
light of this, Romania has requested transitional periods for this sector longer than for
any other sector:
Urban Waste Water Treatment
(91/271/EEC) |
2022 (15 years) |
Drinking Water (98/83/EC) |
2022 (15 years) |
Dangerous Substances (76/464/EEC) |
2015 (8 years) |
Nitrates (91/676/EEC) |
2014 (7 years) |
Almost all the water acquis have been incorporated into national law. Approximation
with the Water Framework Directive is intended to be accomplished in 2003 via legislative
amendments to the existing Water Law 107/1996. Romanias structure for managing water
has been organ-ised on the basis of river basins since 1944, which gives it an advantage
for implementing the Water Framework Directive.
Nonetheless, major implementation and enforcement challenges remain for the bodies
responsible for water management shown on the organi-gramme in section 5.1.5. Two current
institutional changes deserve attention. Firstly, the end of 2002 shall see the
transformation of the National Company Romanian Waters "Apele Romane" into a
Water Authority within the National Administration.37 Secondly, a recent Governmental Decision provides that the
Water Authority should function as the central public authority in the water sector and
from now on undertake implementation of EU requirements.38 This should improve the currently poor co-ordination and
insufficiency of data exchange between the responsible ministries dealing with different
aspects of water management, which has been a substantial obstacle to development of a
financing strategy to upgrade water supply and treatment in Romania.
The 11 river basin directorates are required to monitor water quality and quantity, set
quality standards, establish rules for water abstraction and issue waste water discharge
permits. The 1996 Law on Water established requirements on public participation through
river basin committees. The Water Framework Directive is particularly demanding as it
requires Member States to achieve "good ecological status" for all surface and
ground water by 2010. Romania will need to develop river basin management plans and
establish programmes of measures for each river basin, a number of which may require
significant investment. Implementation will require close co-ordination with industrial
pollution control efforts and development of municipal waste water treatment
infrastructure. Full compliance in these areas is not expected until 2015.
Under a 2.65 MEUR 2001 PHARE programme, a pilot river basin management plan will be
elaborated for the Somes basin, and a cost assessment methodology formulated for the Arges
river basin.39 But these projects will
need to be followed up with additional projects for the other river basins and with
long-term management plans backed by sufficient human and financial resources.
Figure 7.1.
Romania hydrographic network and hydrographic basin boundaries
Much water suffers from nitrate contamination40
and Romania has indicated that it is having some difficulties implementing the
Nitrate Directive.41 The problems are
mainly linked to identification of nitrate waters and designation of vulnerable zones. A
Commission for Application of Action Plan for Nitrate Waters42 has been recently designated and is responsible for preparing
the implementation programme for this Directive. The MWEP intends to develop an
implementation programme that will reach EU compliance for new farms by 2007, and for
existing farms by 2011. A Code of Best Agricultural Practices has been issued in the
framework of a World Bank project, which includes a loan for setting up centralised water
supply systems for 250 rural localities where drinking water is affected by nitrate
pollution.
Implementation of the Drinking Water Directive43
and Urban Wastewater Treatment Directive44
requirements will be especially costly for Romania. Romania has transposed both
directives but requested 15-year transitional periods for each. The Directorate of Public
Health under the Ministry of Health and Family and the municipal level water services
share responsibility for implementing and enforcing the Drinking Water Directive. The
existing monitoring system for drinking water will have to be improved and the
laboratories better equipped to ensure adequate monitoring. A general estimate is that 10
billion EUR is required to implement the Drinking Water Directive. A PHARE programme,
concluded in 2002 aimed to strengthen the institutional and administrative capacity of the
Ministry of Health and Family to implement the Drinking Water and Bathing Water
Directives. Through this project the public health laboratories will be modernised.
Implementation of the Urban Waste Water Treatment Directive is at early stages and a
general implementation plan is needed given that this will be the most expensive Directive
to implement. An important step will be to designate "sensitive areas", i.e.
areas that are subject to eutrophication, since the Directive requires that waste water
discharged into sensitive areas receive additional chemical treatment to remove phosphates
and other nutrients which contribute to eutrophication. This should be completed by the
end of 2003.
Total investment required between 2002 and 2030 to rehabilitate the infrastructure of
the water-sewerage services in urban areas is currently estimated at 4,2 billion EUR and
in rural areas at 5,5 billion EUR.45 These
cost estimates are from the "Governments Strategy concerning the Development of
Local Public Services of Communal Husbandry" developed in 2001 by the Ministry of
Public Administration (MPA). The Strategys findings are discussed in further detail
in section 6 of this report.
The MWEP recognises the significant investment challenge posed by these two Directives
and has given them top priority in its strategy for ISPA financing of environmental
infrastructure as per the following table.
Approved projects46 |
|
Estimated project value |
ISPA commitment MEUR |
ISPA 2000 |
|
|
|
Constanta |
Waste Water |
98.0 |
44.3 |
Iasi |
Waste Water |
51.7 |
23.8 |
Craiova |
Waste Water |
70.6 |
38.3 |
Jiu Valley |
Waste Water |
9.7 |
5.8 |
ISPA 2001 |
|
|
|
Arad |
Waste Water |
18.0 |
8.1 |
Braila |
Waste Water |
60.8 |
13.7 |
Total |
|
308.8 |
134.0 |
The MWEP has requested an additional 193.7 MEUR from ISPA for waste water treatment
facilities for Brasov, Timisoara, Cluj-Napoca, Pascani, Oradea, and Focsani, but these
projects have not yet received ISPA approval. To complete the technical documentation
needed for project approval has proven to be a sometimes formidable hurdle and the
technical assistance available through ISPA can take as much as nine months to become
operational. The more flexible support of bilateral donors has been crucial in helping
Romania prepare eligible projects for IPSA 2000 and 2001 and this need for technical
assistance will remain for the foreseeable future.
The MWEP has compiled an initial inventory of infrastructure investment projects needed
for EU compliance on the basis of information from the 42 EPIs. But the efforts of the MPA
and the MWEP have not yet been combined into the type of detailed Directive-specific
implementation plan needed for accession negotiations in this sector, let alone a master
plan with prioritised projects ready for further development and financing.
Major challenges for the water quality sector
 | How to combine the planning efforts to date of the MWEP, the
EPIs and the MPA on the water infrastructure projects needed in urban and rural areas in
order to comply with EU standards for drinking water and UWWT, and to set priorities for
further project development and financing.
|
 | Developing more reliable and project-specific cost estimates for
achieving compliance with drinking water and UWWT requirements, and a long-term
implementation plan and financing strategy based on realistic transitional periods.
|
 | Identification and designation of sensitive areas under the UWWT
Directive as well as nitrate-vulnerable zones.
|
 | Improvement of data exchange among Ministries and upgrading of
laboratories to extend water monitoring to biological, microbiological and bacteriological
indicators.
|
 | Establishment of a computerised system and an information system on
water management in accordance with the WFD requirements.
|
|
Because of its varied landscape, good dispersion conditions and large forested areas,
Romanias air quality is generally considered good. Air quality has in fact slightly
improved in the past five years due to reduced activity or shutting down of industrial
facilities. However, air quality in highly industrialised urban areas is still a problem.
Moreover, traffic is now a major air pollution source in urban areas due to constantly
increasing numbers of vehicles, most of which are old and not equipped with catalysts to
reduce concentrations of air pollutants in exhaust fumes.
Transposition of the EU Ambient Air Quality Framework Directive47 and its daughter Directives is to be
completed in mid 2003, though to a large extent most requirements are already transposed
into national legislation. The fast process of transposition needs to be followed by a
proper and sustained process of implementation, in order to be able to comply fully with
the EU requirements in the sector. The implementation costs to be covered by central and
local authorities have been estimated at 200 MEUR, including investments in monitoring
equipment, training, and additional administrative capacity.48
In 2001, with Danish assistance, Romania started preliminary assessment of air quality.49 The first conclusions show that the air
quality data collected by Romanias current system do not meet EU data quality
objective requirements. Concentration levels can seldom be compared to EU limit values
because of differences in sampling and analysis methods used and lack of proper equipment.
Due to lack of resources at the institutions involved, monitoring equipment is poorly
maintained, and assessment methods are not in compliance with EU reference methods.
Romanias ambient air quality monitoring currently involves two separate and
parallel systems: the "National Air Quality Monitoring Network" operated by the
county-level Environmental Protection Inspectorates (EPIs) under the MWEP, and the
"Community Air Pollution Monitoring Network" operated by the local offices of
the Ministry of Health and Family (MHF) and the Institute of Public Health (ISPB). In
1999, these parallel networks had respectively 350 and 86 sampling locations, and the
exchange of data on air quality was poor.
To end this duplication, it is proposed that the MHF start phasing out its monitoring
network, keeping a few representative stations to provide supplementary information. This
would enable health authorities to focus on assessing population exposure to air pollution
and the impact on health, as well as on informing the public about any air pollution
risks. It is also proposed that the MWEP limit the number of monitoring stations within
its network to the minimum required by the EU Directives, and to focus on providing the
necessary equipment for all stations during the next 2 years and on proper information
exchange among all stakeholders.
An EU-compliant system of integrated air quality assessment and management for Romania
will require replacement of existing methods of monitoring, including gradually changing
to an automatic air quality monitoring system, so as to form over time a complete and
relevant air pollution monitoring network. A PHARE project "Local Investment in the
EPI of Bucharest for Air Quality Monitoring" (total budget 4 MEUR) will purchase
automatic AQ monitoring stations for Bucharest by the end of 2003. Under the PHARE 2001
programme, 10 selected EPIs will also receive EU-compliant AQ monitoring equipment (total
budget 1.46 MEUR).50
A National AQ Reference Laboratory (NAQRL) will also need to be established for
purposes of auditing, quality assurance, measurement standard methods, reference standards
and international comparison studies. ICIM has been appointed to this role, but will need
significant investment in equipment and facilities upgrading as well as technical
assistance in order to serve as the NAQRL.51
One of the objectives of air quality monitoring is to provide the information for
management of air quality, a responsibility that rests primarily with local governments,
in coordination with the EPIs and local health authorities.
The DANCEE project assisted Romania in the designation of 11 urban areas as
"agglomerations"52 for the
purpose of assessment and management of air quality according to EU requirements. These
include the major municipalities of Romania (including surrounding communes) as well as
those with city-specific air quality problems: Bucharest, Baia Mare, Ploiesti, Pitesti,
Constanta, Craiova, Cluj, Iasi, Galati + Braila, Brasov and Timisoara53.
Air quality management plans are to be developed in consultation by the competent
authorities, the titleholders, and any interested members of public, and may include such
measures as suspension of road traffic at times when limit values are exceeded.
The results of air quality assessment, now published annually in the Report on the
State of the Environment, will need to be made available to the public in a timely
manner, as the EU Directives require. The new informational system should provide regular
(daily and even hourly) information to the public, and is planned to become functional and
EU-compliant no later than 1 January 2006.54
The most costly of the air sector requirements are those of the "Stage I"
Directive on Volatile Organic Compounds (VOCs).55
A preliminary inventory of the facilities covered identified:
 | 534 facilities for petrol storage at terminal, of which 103 are considered in compliance
with EU requirements;56 |
 | 660 facilities for petrol loading at terminals, of which 60 are considered in accordance
with the EU requirements;57 |
 | 1954 petrol distribution stations, of which 511 are considered in accordance with the EU
requirements. |
Compliance will require significant investment, estimated at 1.3 MEUR for each storage
facility and 0.45 MEUR for each petrol distribution station. All facilities for petrol
loading at terminals will be expected to comply with the Directive by 2007, but Romania
has requested an additional 3 year transition period for petrol distribution stations with
compliance to be achieved by 2010.58
With regard to EU requirements for placing petrol and diesel fuels on the market, only
unleaded petrol will be allowed as of 1 January 2005.59 The sulphur content in fuel is to be reduced gradually between
2001 and 2007, and starting with 2007, companies will have to place on the market and/or
use only fuel oil with a sulphur content of 1%. For diesel fuel, a maximum sulphur content
of 0,005% of its weight will be acceptable. Implementation will require major
technological refurbishment at Romanias refineries. One calculation estimated the
cost of implementation at about 168.5 MEUR, while another estimated the cost at 225 MEUR
for gasoline and 40 MEUR for diesel fuel.60
Major challenges for the air quality sector
 | Establishment of full capacity within the relevant institutions
in Romania for air quality modelling and assessment, and for the use of GIS systems in
environmental mapping
|
 | Completion of the transposition of the EU air quality requirements
through regulations on procedures for developing and implementing air quality plans and
programmes
|
 | Establishment of a national reference laboratory for air quality
analyses, along with an extensive quality control and accreditation programme covering
other laboratories in the MWEP air quality monitoring network
|
 | Preparation of emission inventories in co-ordination with activities
to implement the EU industrial pollution control requirements, e.g., the Polluting
Emissions Register
|
|
Waste management is an area where Romania has much to do to bring its situation up to
EU standards. There is a general lack of adequate facilities to treat properly and dispose
existing waste streams. Moreover, hazardous waste is often co-disposed with ordinary
household waste, leading to serious pollution from inadequately protected landfills.
Of the over 55 million tons of waste generated in 2000, some 15% was municipal waste
and the remaining 85% industrial and agricultural waste. Municipal waste generation has
remained fairly stable since 1993, but the 40% of household waste (i.e. over 2 million
tons per year) made up of recyclable materials (paper, carton, glass, plastic, metals) is
not recovered, but disposed into landfills together with other urban waste. On the other
hand, industrial waste has shrunk dramatically, due to decreased industrial activity,
improved production technologies and better environmental management. 2001 saw a
particularly steep drop in the quantity of hazardous waste generated on account of reduced
activity in the field of chemical and metallurgy industries.
Waste generated in Romania during 1993 2000 (in million tons)
Waste type |
1993 |
1994 |
1995 |
1996 |
1997 |
1998 |
1999 |
2000 |
Industrial (incl. mining waste) &
agricultural waste |
260.8 |
320.8 |
353.1 |
103.2 |
209.4 |
75.8 |
69.0 |
47.0 |
Municipal waste |
8.6 |
6.8 |
6.84 |
6.7 |
6.0 |
5.4 |
6.2 |
8.2 |
Responsibility for waste management is shared by central government and by local public
administration authorities. The MWEPs Waste and Dangerous Chemical Substances
Management Division is responsible for transposing the EU waste management requirements, a
task now largely completed, and for national strategies and implementation measures.
In accordance with the EU waste framework requirements, the MWEP has prepared a
National Waste Management Strategy and a National Action Plan for Management of Industrial
and Urban Waste. The National Strategy sets out the necessary steps for collecting,
recycling, treating and disposal of waste, as well as future trends and cost estimations.
County governments are required to elaborate County Plans for Waste Management as well, so
that the final National Plan for Waste Management can be finalised in early 2003 and
approved thereafter by the Government.61
But significant practical problems of implementation remain. Statistical data show only
half of the population is served by municipal waste collection services. Only 2,500 of
Romanias 13,000 localities have orga-nised systems of collecting, transporting and
depositing urban waste.62 Villages in
particular are rarely covered by municipal waste management services.
Disposal infrastructure is also a problem, with almost all waste municipal and
industrial going to landfills. Most landfills do not have insulating linings to
stop hazardous substances contaminating groundwater and as such are major sources of
surface and groundwater contamination.
To meet the EU requirements, Romania like other candidate countries will
need significant investment in waste management infrastructure, including modern landfills
and incinerators, as well as capacity for collection and recycling of packaging waste. In
recognition of this financial challenge, Romania has requested the following transition
periods for this sector:
Landfill Directive (99/31/EC) |
2017 (10 years) |
Waste Incineration Directive (2000/76/EC) |
2010 (3 years) |
Packaging Waste Directive (94/62/EC) |
2010 (3 years) |
It will take up to 15 years to build the new landfills and composting facilities required
for compliance with the Landfill Directive63,
and to close the existing inadequate landfills.64
Only eight municipal landfills out of the existing 1,250 landfill sites for
municipal and industrial waste currently in use meet the Landfill Directive standards.65
According to the National Plan for Waste Management (preliminary plan), the current
number of landfills will be consolidated into 127 regional landfills, with the necessary
number of transfer stations established at county level. Four additional landfills are now
under construction for the municipalities of Bucuresti-Glina, Pitesti, Slatina, and
Banesti. Timisoara and Rimnica Valcea municipalities have applied for ISPA funding for
landfills, and Dambovita County has applied for funding for a complex integrated waste
management project including two landfills.
The requirements of the Sewage Sludge Directive66
will pose significant implementation problems for Romania, with the advent of
additional urban wastewater treatment. Plans are not yet in place for how this challenge
will be met.
Incineration is not yet in use as a method of municipal waste disposal, due to the high
humidity of Romanias household waste. But Romania like most Member States
expects to depend on incineration as part of its overall waste management strategy
for handling a range of EU requirements from packaging to medical waste. It has requested
a transition period of 2010 for the Waste Incineration Directive67 in order to construct incineration facilities that comply with
the provisions concerning emissions of air, water and soil pollutants from incineration
facilities. The estimated cost for building new municipal incinerators is 195 MEUR and for
hazardous waste incinerators 1,2 billion EUR.68
Implementation of the Packaging Directive69
will also require significant investment in facilities for collecting and processing
packaging waste and to develop the market for secondary raw materials resulting from the
recycled waste, and so Romania has also requested a three year transition period in this
area. In the meantime, the legal framework has been put in place, including the
introduction of economic instruments aimed at facilitating implementation. Romania already
has some experience in selective waste collection, due to partial implementation in the
municipalities of Rimnica Valcea, Piatra Neamt, Timisoara and Brasov. But this selective
collection is for urban waste in general and not for packaging waste in particular. In
order to obtain accurate data regarding the investment costs needed, a one year long pilot
project will start by the end of 2002. At the end of the pilot project more accurate cost
estimates will be available.70
Romania intends to implement the EU requirements on waste oil by 2007. The priority
will be to construct modern installations for waste oil regeneration. Though no collecting
system for this category of waste is in place at this time, national legislation
transposing the EU requirements has established a system for collecting and recycling
waste oils as well as the legally binding duties of producers, collectors, carriers and
regenerators of waste oils. A recent study71 estimates
that the cost of using a modern installation for waste oil regeneration is 11.8 MEUR/
year. In the absence of a competitive technology for regeneration, the waste oils could
alternatively be co-incinerated in Romanias eight cement factories bringing the
annual cost of disposal down to approx. 2.9 MEUR/year.
Concerning the EU requirements for specific hazardous waste streams, a Secretariat for
PCB compounds has been established to co-ordinate at national level the inventory of the
equipment and materials containing PCBs/PCTs and related implementation measures. Though
the EU requirements for disposal of batteries and accumulators have been fully transposed,72 there is no system of collecting, reusing or
disposing of used batteries in Romania at this time. Also, a formal agreement must be
reached between producers and traders of batteries and accumulators to inform the public
about the necessity of collecting, reusing or disposing of such products turned into
wastes. However, an economic instrument to stimulate the collecting of used car batteries
from the population has been introduced. The costs for implementing this Directive have
been estimated to range between 3.6 and 5.0 MEUR, depending on the plants and
vehicles lifetime.
The administrative structure for implementing the Waste Shipment Regulation will be
established via a forthcoming governmental decision that will nominate the responsible
authority for the import, export and transit of waste and require internal application of
the notification procedure for transboundary waste transport.
The recently enacted Directive on End of Life (EOL) Vehicles73 will also pose a significant challenge for Romania, which has
2.1 million EOL vehicles, of which 1.6 million are the locally manufactured Dacia brand.
The costs that should be supported by the producers for treating EOL vehicles come to
167.8 MEUR for the entire fleet (80 EUR/vehicle), out of which 127 MEUR for the Dacia
fleet alone. One difficulty is that many of the vehicle manufacturing companies from
Eastern Europe or the former USSR no longer exist, so that Romanias surviving
vehicle manufacturers may end up shouldering the major burden of financing the necessary
collecting, recycling, reuse, and recovery system. At present, Romania has only one plant
for treatment of EOL vehicles, without fluids and batteries, but this plant would have
sufficient capacity to treat all domestic EOL vehicles at the cost of approximately 163
EUR/vehicle. The investment costs that will have to be supported by the national service
network to implement this Directive have been assessed by ACAROM74 to 20,483 EUR for every repair and maintenance unit (Service
Auto), or 32 MEUR overall.
The total estimated cost of investment for compliance with EU waste management
requirements is nearly 676 MEUR, out of which nearly 360 MEUR are planned to come from
external grants.75 Establishment of
adequate waste management systems (sanitary landfill sites including closure of existing
sites; separate collection and recycling systems) represents Romanias second
environmental priority under ISPA.76 About
8,3 MEUR was allocated out of the 2002 ISPA budget for a project concerning the selective
collection of household wastes in Piatra Neamt, and another 31 eligible projects have been
identified in the waste management sector. In order to obtain the requested transition
periods, Romania now needs to develop a detailed financing strategy to show how it will
achieve the investments in waste management infrastructure to meet the EU requirements. A
preliminary assessment of the overall costs for the implementation of the EU waste
requirements will be made within a PHARE 2000 twinning project with France. Affordability
will be a major issue for Romanian municipalities.
Major challenges for the waste sector
 | How to support the elaboration of county-level waste management
plans so that the National Waste Management Plan can be finalised in 2003
|
 | Development of implementation plans including financing strategies
for the Landfill Directive, Waste Incineration Directive and the Packaging Directive
|
 | Setting in place systems for collecting, reusing and disposing of
used batteries, and for collecting and recycling used packaging waste
|
|
Due to its bio-geographical position and rich level of biodiversity, Romania has highly
valued natural areas and various species of fauna and flora. More than 37,500 species have
been recorded in the national territory, of which 3,700 are plant and 33,082 animal
species. There are 827 natural protected areas, which represent 5.18% of the national
territory.
Romanian Network of Protected Areas
Category |
Number |
Scientific reserves |
43 |
National Parks |
12 |
National Reserves |
363 |
 | 122 botanical
|
|
|
 | 15 zoological
|
|
|
 | 65 geological
|
|
|
 | 58 speleological
|
|
|
 | 52 paleontological
|
|
|
 | 51 forests
|
|
|
 | 155 mixed
|
|
|
Landscape Reserves |
18 |
Biosphere Reserves |
3 |
World natural heritage |
1 |
Ramsar Sites |
2 |
The Danube Delta Biosphere Reserve has been declared a World Natural Heritage, a Biosphere
Reserve within the UNESCO-MAB Reserves Network, and a Ramsar Site. The reserve is the
largest and the least damaged wetland in Europe and is managed by the Danube Delta
Biosphere Reserve Authority. A number of LIFE and international projects have been
developed in this area to repair the damage caused by human activity and to restore the
natural habitat.77
Romanian forests are well preserved and any forest damage is mainly due to natural
droughts. Forests are divided in two different categories depending on whether they have
special protection functions or are used mainly economic exploitation. Forests under the
first category amount to more than half of the total forest area. Monitoring of forests is
undertaken by the International Co-operative Programme on Assessment and Monitoring of Air
Pollution Effect on Forests (ICP Forests).
Although EC legislation in the nature protection sector will not require heavy
investment, the measures needed to implement their requirements will place a heavy
administrative and financial burden for Roma-nian authorities. Furthermore, the Commission
has indicated that approximation in this particular sector needs to be prioritised to
prevent irreversible damage to valuable natural areas, but also to ensure early
identification of protected areas before expectations of increased land value will make it
more difficult to ensure effective protection.
The competent authorities in this sector are the MWEP and the Ministry of Agriculture
Food and Forests. Co-ordination of implementation activities undertaken by both
institutions has not been easy and only limited achievements have been made as regards EU
specific obligations (such as preparing an inventory of sites and further identification
of special areas of conservation and special protection areas to prepare for the Natura
2000 network).
National legislation approximating EU standards for natural habitats is now in place.78 There is a good legal framework for hunting
wild animals, which is more stringent than EU requirements as it covers all wild animals
and not only endangered species. In addition, integration of biodiversity protection and
spatial planning has been ensured in national law.
Since 2001, the Council of Europe has been providing technical and financial assistance
to implement the Bern Convention on Conservation of Natural Habitats and Wild Life in
Europe79 via the Emerald project. The
project has set in place an Emerald Network of Protected Areas for natural habitats and
wild species of European interest including an inventory of biogeographical regions and
establishment of a database. Another project drew a CORINE biotope list for sites for
Community importance (SCIs) under the Habitats Directive. A number of GEF projects have
provided for targeted assistance to protect ecosystems in the Macin mountains and the
Maramures area. During the period 2001-2002 many LIFE-Nature projects have been approved.
Cost estimates of compliance have been assessed by the Ministry of Water and
Environmental Protection at 3.5 MEUR for the Habitats and 1.2 MEUR for the Wild Birds
Directives, respectively. These represent public sector costs for the administrative
structures needed to manage Romanias areas requiring special protection.
Major challenges for the nature protection sector
 | Designation of a responsible institution to monitor nature and
biodiversity
|
 | Development of management plans for protected areas, as well as a
national strategy with a list of priorities for such areas
|
 | Further development of Natura 2000 lists, including identification
of habitats types and distribution of species
|
|
The EU requirements with respect to chemicals control are aimed at minimising risk to
health and the environment, and at the same time at facilitating the trade in chemicals
and chemical products through mutual recognition of safety tests and harmonised labelling
and packaging standards. The CEE countries lacked similar marketplace controls during the
socialist period, so the task of approximation with these requirements has required
establishing new administrative structures and analytical capacity. If the proposed EU
Strategy for a future Chemical Policy goes into effect, thousands of chemicals already in
use will undergo review and assessment, a burden which the new Member States will be
expected to share.
Romania has started to set in place the administrative framework for this sector. In
2001 it established the National Agency for Dangerous Chemical Substances and charged it
with responsibility for the framework EU requirements on the classification, packaging and
labelling of dangerous substances. Also in 2001, the MWEP established the Directorate for
Waste and Dangerous Chemical Substance Management, which holds responsibility for the EU
requirements with respect to asbestos, risk assessment of existing substances, import and
export of certain chemicals, and biocides.
Romania is rather advanced in its regulatory system for genetically modified organisms
(GMOs) and genetically modified microorganisms (GMMs), having fully transposed and almost
completely implemented the Directive on Contained Use of GMMs80, as well as many of the provisions of the Deliberate
Release of GMOs Directive.81 Transposition
has also been completed for the Directive on the Protection of Animals Used for
Experimental and Other Scientific Purposes.82
In addition, Romania has taken significant steps to implement the EU requirements with
respect to ozone depleting substances (ODS).83
The MWEP created the Ozone Secretariat in 2001. Together the MWEP and the Ozone
Secretariat are responsible for authorising the import and export of ozone depleting
substances, granting exceptions, and maintaining a database on ozone depleting substances.
A National Training Centre has been established at the Research Institute
"ICPIAF-Cluj Napoca", which provides certification of service technicians for
the refrigeration sector. Romania has been a party to the Montreal Protocol since 1993,
but has still to ratify the Beijing Amendment.84
But as noted in the 2002 Regular Report,85
much remains to be done in this area, particularly with respect to the framework
controls. Drafting of the legislation needed to transpose the EU requirements on the
classification, packaging and labelling of dangerous substances is at a very early stage,
yet the stated target date for transposition is 2002. A draft Governmental Order to
transpose the EU controls with respect to asbestos is also planned for 2002. The complex
EU system of controls over biocides (pesticides for purposes other than plant protection)
will also require a special transposition effort, possibly via a Government Decision,
which is planned at this point for the year 2005. Similarly, steps have not yet been taken
to implement the Regulation on Import and Export of Dangerous Substances.86
Moreover, there remains the need to develop capacity for testing of chemicals according
to EU methodologies and standards, and for assessing risks associated with their use,
prior to determining whether further controls are needed. This will require good
laboratories accredited to EU standards for testing chemicals for various properties, as
well as specialists trained in carrying out complex risk assessments based on the data
generated. Romania may need targeted technical assistance for years to come in order to
develop the technical and human capacity required to meet its regulatory role in
accordance with EU controls for this sector.
Major challenges for the chemicals sector
 | Finalisation and approval of the draft legislation that will set
in place the EU framework requirements on classification, labelling and packaging of
dangerous substances;
|
 | Clarification of the steps for implementing controls over the
export/import of dangerous substances, and for protection of animals used for experiments;
|
 | Gathering and reporting of data on ODS placed on the market and
improvement of the monitoring system for the National ODS Phasing Out System;
|
 | Elaboration of a chemical safety study-system, including of the
existing institutional framework, to determine additional measures needed to meet EU
analytical and risk assessment requirements.
|
|
The two major EU accession-related issues of concern in this sector are the safety of
nuclear power plants and controls to ensure adequate protection from other sources of
radiation. Concerning the first of these concerns, Romania has one operative nuclear power
plant and another under construction. The EU has no formal standards in the area of
nuclear installation safety, which is traditionally an area of national responsibility.
Nonetheless, a body of best practices has evolved in the Member States that can be used to
evaluate candidate country progress towards a high level of nuclear safety in their
nuclear power installations.87
Romanias nuclear power plant, Cernavoda-1, was connected to the grid in 1996. It
is a CANDU reactor, a standard Canadian design that is considered to meet western safety
standards. Cernavoda-2, another CANDU reactor, is under construction and 40 50%
completed, with a projected completion date of 2005-6. Only a small percentage of work to
date has been carried out on Cernavoda-3, a project that may be abandoned. The National
Commission for Nuclear Activity Control (CNCAN), subordinated to the MWEP since 2001, is
responsible for overseeing the Cernavoda NPPs.
A 2001 Council of Ministers Report entitled "Nuclear safety in the context of
enlargement" evaluated nuclear installations in the candidate countries and in
general gave Romania a favourable report in this area. It made several recommendations
specific to Romania, including to:
 | develop and implement an action plan for CNCAN, including a training programme and
technical support aimed at strengthening the independent assessment capability of CNCAN,
its inspection practice and emergency preparedness organisation, and to increase the
resources of CNCAN. |
 | improve the financial situation of Cernovada NPP in order to ensure implementation of
safety-related improvement programmes and maintenance activities; |
 | establish an on-site emergency operating centre well separated from the main control
room, in compliance with widely applied practices within the EU. |
 | ensure that CNCAN has adequate resources to regulate Romanias other nuclear
installations than nuclear power reactors. |
Concerning radiation protection, Romania has already transposed virtually all of the EU
legal requirements with respect to radiation protection, including the Basic Safety
Standards Directive (BSSD)88 and the EU
directives on information to the public in case of radiological emergency, protection of
outside workers and medical exposures. Activities to implement the BSSD have included
elaboration of national and county-level plans for protection and intervention in case of
a nuclear accident or radiological emergency, a system of prior authorisation for
practices involving a risk of ionizing radiation, and a National Doses and Radiation
Sources Register to include all ionizing radiation sources authorized for use and/or
holding. Romania has also developed international co-operation including early
notification of a nuclear accident and on bilateral agreements with neighboring states.
The Directive on informing the general public about health protection measures in the
event of a radiological emergency was transposed in 2000.89 Romania has already developed communication systems to provide
prior information on health protection measures to the population likely to be affected by
a radiological emergency and trained trainers of Civil Protection Counties Inspectorates,
concerning elaboration of the county-level Plans for Protection and Intervention in case
of radiological Emergency.
The Directive on health protection of individuals in relation to medical exposure will
pose significant costs for Romania.90 The
control system to ensure the safety and safe use of radiological equipment includes
mandatory diagnostic reference levels for radiodiagnostic examinations and establishes
dose constraints for individuals helping to support those undergoing medical exposure, as
well as acceptability criteria for radiological installations. Much of the radiological
equipment currently in use by dentists and hospitals will need replacement to meet these
standards.
The Council Regulations establishing maximum permitted levels in contaminated
foodstuffs and feeding stuffs,91 as a
consequence of nuclear accident or radiological emergency, were transposed in 2002 via a
Joint Order of the CNCAN President, the Minister of Health and Family, and the Minister of
Agriculture, Food and Forests. The process of setting up a monitoring system and improving
the existing one will be finished at the end of 2002. Products that do not comply with the
maximum acceptance levels are forbidden from human or animal consumption. All shipments of
radioactive materials on or through Romanian territory are regulated through an
authorisation and control system set up in 2001.
Major challenges for the nuclear safety and
radiation protection sector
 | Provide further resources for CNCAN, including increased
salaries and other measures to strengthen its capabilities.
|
|
Noise levels continue to increase in almost all Romanian cities, with the noisiest
being Bucharest, Brasov and Braila. It is hoped that noise levels will come down in the
future, as a series of EU directives are set in place. Most of the EUs current
requirements in this sector are product standards and, according to the 2002 Regular
Report, additional work is necessary to approximate these requirements.
Romania has transposed the Directive on Airborne Noise Emitted by Household Appliances.92 The Romanian Accreditation Association
(RENAR) is responsible for introducing the relevant European standards for testing
household appliances, and the National Authority for Consumers Protection has been given
responsibility for inspection and enforcement. Romania expects to have this Directive
fully implemented in 2003.
The EU requirements for noise from equipment for use outdoors have not yet been
transposed or implemented,93 though the
Ministry of Industry and Resources has produced a first draft of a study regarding the
level of noise emitted by equipment for use outdoors. The intention is that this directive
will be transposed by 2004, and implemented fully between 2006 and 2007.
The greatest challenge in this sector will be giving Romanian producers sufficient time
to make the technical changes to their products needed for compliance.
Major challenges for the noise sector
 | Provision of information to Romanian producers of products
subject to the EU noise requirements concerning the steps they will need to achieve
compliance
|
|
Romanias Environmental Protection Strategy states its aim of strengthening its
institutional capacity through participation in environmental agreements and through
bilateral, regional and multilateral co-operation. The following table demonstrates
Romanias position, together with the other candidate countries, with regard to
selected multilateral environmental conventions:
Table 4.5
Stage of play of selected multilateral environmental agreements
Convention |
CBD |
CITES |
CMS |
BASEL |
OZONE |
UNFCCC |
UNFCCD |
RAMSAR |
CEC Country |
R |
A |
R |
A |
R |
A |
R |
A |
R |
A |
R |
A |
R |
A |
R |
A |
Bulgaria |
X |
|
|
X |
|
X |
|
X |
|
X |
X |
|
|
X |
X |
|
Czech Republic |
X |
|
X |
|
|
X |
X |
|
X |
|
X |
|
|
X |
X |
|
Estonia |
X |
|
|
X |
|
|
|
X |
|
X |
X |
|
|
X |
X |
|
Hungary |
X |
|
|
X |
|
X |
X |
|
|
X |
X |
|
|
X |
|
X |
Latvia |
X |
|
|
X |
|
X |
|
X |
|
X |
X |
|
|
X |
X |
|
Lithuania |
X |
|
|
X |
|
|
|
X |
|
X |
X |
|
|
X |
X |
|
Poland |
X |
|
X |
|
|
X |
X |
|
|
X |
X |
|
|
X |
|
X |
Romania |
X |
|
|
X |
|
X |
|
X |
|
X |
X |
|
|
X |
|
X |
Slovak Republic |
X |
|
X |
|
|
X |
|
X |
X |
|
X |
|
|
X |
X |
|
Slovenia |
X |
|
|
X |
|
X |
|
X |
X |
|
X |
|
|
X |
X |
|
European Union |
X |
|
|
|
X |
|
X |
|
X |
|
X |
|
X |
|
|
|
* R= Ratification, acceptance, approval or succession; A= Accession
Within the MWEP, international co-operation and EU integration activities are managed
by the General Division for European Integration, Pro-grammes, Projects and International
Affairs. One sub-division deals with programmes, projects and international affairs,
whilst the other deals with European integration. Romanias National Environmental
Action
Plan (NEAP) contains measures required by bi-lateral and multi-lateral conventions and
lists of projects that are financed by the EU or other forms of international or bilateral
co-operation.
To work alongside the NEAP inter-ministerial Committee, nine "sector" working
groups were created in 1999 to co-ordinate the transposition of the environmental acquis,
such as the working groups on climate change, on GMOs, and on ozone depleting
substances. Whilst these groups work on transposing the EU acquis they are often
simultaneously working on implementation of international environmental agreements.
Concerning protection of the ozone layer, Romania is party to the Vienna Convention for
Protection of the Ozone Layer and also the Montreal and London amendments. An Ozone
Secretariat has been created within the MWEP. The Ozone Secretariat monitors and licenses
imports and exports of ODS in close co-operation with the customs authorities. Romania has
committed to reducing its ODS emissions to zero between 2005 and 2015. The intention is to
achieve early implementation of the Montreal Protocol and to eliminate use of ODS before
EU accession.
Much of Romanias international effort has been in the field of biological
diversity protection. As the last table indicated, Romania became a Party to the
Convention on Biological Diversity in 1994. In 2000, Romania ratified the Agreement on the
Conservation of Bats in Europe, the Agreement on the Conservation of Cetaceans of the
Black Sea, Mediterranean Sea and Contiguous Atlantic Area as well as the Agreement on the
Conservation of African-Eurasian Migratory Waterbirds. Romania is a Party to the Bonn
Convention on the Conservation of Migratory Species of Wild Animals and to the Ramsar
Convention on Wetlands of International Importance Especially as Waterfowl Habitat.
Romania is one of the six countries bordering the Black Sea, one of the worlds
most remarkable regional seas for its isolation (only the Bos-phorus Straits as outlet)
and for the size of its drainage basin (almost one-third of continental Europe). The
Convention for the Protection of the Black Sea against Pollution was signed by Romania in
1992, and ratified in 1993. Romania has also ratified the Conventions three
Protocols (control of land-based sources of pollution, dumping of waste, and joint actions
in case of accidents e.g. oil spills). It participates actively in the various regional
projects and programmes of the Black Sea Environmental Programme, including the current
Global Environment Facility (GEF) Black Sea Ecosystem Recovery Project. Romania is also a
Party to the Danube Convention.
In 1994, Romania ratified the UN Framework Convention on Climate Change, (UNFCCC) and,
in 2001, became the first Annex I signatory country to ratify the Kyoto Protocol.94 Romania is an Annex I Party to the UNFCCC, i.e.,
one of the industrialised countries that historically has been a significant generator
of the greenhouse gases (GHG) that are now contributing to climate change.
The Annex I Parties include both relatively wealthy countries that were members of the
Organisation for Economic Co-operation and Development (OECD) in 1992, like Denmark, and a
number of countries with "economies in transition", like Romania. Because their
per capita GHG emissions are higher than those of most developing countries, and because
they have greater financial and institutional capacity to address climate change, the
Annex I Parties are expected to lead the effort to modify long-term emissions trends. The
countries with "economies in transition" (EIT) were given certain flexibility in
this respect. Whereas the OECD countries made a commitment to return their GHG emissions
to 1990 levels by the year 2000, the EIT countries were allowed to select a baseline year
before the economic changes that led to big reductions in their emissions.
Romania has made a commitment to reduce its greenhouse gas emissions by 8% between 2008
and 2012, as compared to its baseline year of 1989. In 1989, Romanias total
aggregated emissions of GHG, calculated as CO2 equivalent, were 271 million tons. By 1994,
this had dropped to 171 million tons, just 62% of its 1989 GHG emissions, a decrease
largely due to industrial production cutbacks rather than to climate change measures. As
of 2000, Romanias aggregated GHG emissions were calculated at 141 million tons.
In its efforts to return to sustained economic growth, Romanias GHG emissions are
expected to increase slightly till 2008 unless Romania is able to preserve the reductions
in emissions by implementing energy efficiency and other GHG reduction measures.
The National Commission on Climate Change was established in 1996 as an
inter-ministerial body co-ordinated by MWEP to promote the necessary measures for unitary
application in Romania of the objectives of the UNFCCC and Kyoto Protocol.
Under the Kyoto Protocols joint implementation (JI) mechanism, Romania and other
EIT countries may sell any "additional" reductions in emissions to other Annex I
countries that may need to buy emission reduction units (ERU) as part of their own efforts
to meet their climate change commitments. Because of Romanias relatively high level
of energy intensity (see discussion on energy in next section), Romania has great
potential to attract investments through the JI mechanism aimed at bringing about more
energy efficient and cost-effective technologies in the power, heating, transport and
industrial sectors.
Towards this end, Romania has already signed JI agreements with Switzerland, the
Netherlands, Norway and Austria, and is about to sign a JI agreement with Denmark.
Co-operative arrangements are also in place with Sweden, Canada and the Prototype Carbon
Fund. The first Kyoto commitment period when Annex I countries will be able to exchange
ERUs is between 2008 and 2012.
As one of its first JI projects in Romania, the Netherlands has agreed to support a
cogeneration and district heating project for the municipality of Targoviste, for a total
value of 13.8 MEUR. In exchange, it will receive 1,536,140 ERUs between the years 2008 and
2012, at a price of 9 EUR per ERU. The benefits to Romania will include a more efficient
heating supply for the municipality, less fuel consumption and cheaper energy, better air
quality for the municipality, a decrease in CO2 emissions, and technologies to enable the
plant to comply with EU standards for large combustion plants. The project will provide a
positive example of foreign direct investment in municipal infrastructure, which it is
hoped will encourage similar FDI investments. Similarly, Switzerland has agreed to provide
JI funds for a project to reconstruct the district heating systems of Buzau and Pascani,
and Norway has agreed to support refurbishing of the district heating system of Fagaras.
Romania hopes to follow up on these initial JI projects by bringing in other JI
investments in energy efficiency and other measures. But to take full advantage of the JI
opportunity, Romania will need to develop its institutional capacity and legal framework
by 2007, including finalisa-tion of a national system for assessment of greenhouse gas
emissions. Hurdles include the need to set in place the legal, administrative and
practical instruments for carrying out more accurate assessment of Romanias GHG
emissions, assessing the "additionality" of proposed GHG reduction measures, and
monitoring and verification of CO2 reduction measures.
The commitment to prepare for EU accession brings an additional hurdle for Romania. In
the first place, it must be able to meet the EU requirements for calculating and reporting
GHG emissions,95 which are largely in
accordance with the UNFCCC requirements. Parties to the UNFCCC were expected to submit
their third national communications to the UNFCCC by October 2001, but Romania has not yet
submitted its third national communication.96
The National Institute for Environmental Protection under the MWEP has elaborated the
National GHG Inventory for 2000 and for the years 1992 1999. Quality control checks
are now being carried out before submitting the data to the UNFCCC Secretariat by the end
of 2002. The Third National Communication to the UNFCCC is also in a final stage of
development.
This delay in meeting the UNFCCC reporting requirements is an indication of the
challenges that Romania will face in meeting the similar EU reporting requirements. These
challenges will only increase if the EU decides to adopt a GHG emissions trading scheme,
as currently proposed by the European Commission.97
The MWEP has recently taken steps to organise a special Climate Change Unit as an
important capacity-building measure, building on a previous JI unit that was largely
supported by Dutch technical assistance. It has just started work on a National Action
Plan for GHG Emissions Reduction that will be issued in mid 2003. The MWEP is seeking
assistance for this activity.
Romanias potential for achieving significant improvements in energy efficiency
through JI investments is vast, but this will require development of the capacity to meet
this challenge. It is likely to need significant technical assistance in this area for
years to come.
Major challenges for climate change
 | Strengthening of the administrative capacity for identifying,
preparing and negotiating JI projects, including support for municipalities with potential
JI projects.
|
 | Development of technical and institutional capacity for assessing
projects for additionality and for monitoring and verification of emission reduction
measures.
|
 | Building information and technical systems needed to assess GHG
emissions and to meet the EU and UNFCCC reporting requirements effectively.
|
|
19. |
Position Paper of Romania for Chapter 22 on Environmental
Protection, 18 October 2001.
|
20. |
Governmental Decision no. 1115/2002 at Free Access to
Environmental Protection (published 28.10.2002).
|
21. |
The National Research-Development Institute for Environmental
Protection, under the MWEP.
|
22. |
The National Commission for Nuclear Activities Control also
prepares an Annual Report on Environmental Radioactivity Surveillance in Romania.
|
23. |
Governmental Decision No 918/2002 (OJ No 686/17.09.2002).
|
24. |
Romanias Local Agenda 21 programme started in November
2000 and is currently implemented in Ploiesti, Galati, Targu, Mures, Baia Mare, Iasi,
Ramnicu Valcea, Giur-giu, Oradea, and Miercurea Ciuc with the support of United Kingdom
and Canada. A previous pilot project to prepare a LEAP for Piatra Neant was supported by
Denmark. The National Forum on Sustainable Growth of Local Communities, "A way
towards the Integration in the European Union" on April 2002, decided to extend the
programme to 40 additional towns.
|
25. |
A National Coordinating Committee composed of officials of
the MWEP and other relevant ministries, research institutes and NGOs (Ecosens, Pro
Democratia, and the Strategy and Development Foundation) follows the development of the
LEAPs.
|
26. |
Council Directive 96/61/EC concerning integrated pollution
prevention and control (IPPC).
|
27. |
"Baseline Study: Romanian Approximation Strategy for the
Industrial Pollution Control Sector", by COWI & CarlBro International for the
Romanian Ministry of Waters and Environmental Protection, through the DANCEE programme,
August 1999. The 1999 study estimates that as few as 25% of all Romanian installations
coming within the IPPC Directive hold environmental permits.
|
28. |
"Administrative Capacity for Implementation and
Enforcement of EU Environmental Policy in the 13 Candidate Countries", Service
Contract B7-8110/2000/159960/MAR/H1, by ECOTEC Research and Consulting in association with
the Institute of European Environmental Policy, at page 143.
|
29. |
By the end of 2003, the MWEP plans additional regulations to
cover the setting up of a national register containing all information requested by the
directives of this field and the assessment of environment pollution.
|
30. |
Council Directive 76/764/EEC on dangerous substances
discharged to the aquatic environment and its 7 Daughter Directives.
|
31. |
Council Directive 88/609/EEC on the limitation of emissions
of certain pollutants into the air from large combustion plants (LCP), as amended by
Council Directive 2001/80/EC.
|
32. |
Council Directive No 1999/13/EC on the limitation of
emissions of volatile organic compounds due to the use of organic solvents in certain
activities and installations (VOC).
|
33. |
Council Directive 96/82/EC on the control of major accident
hazards involving dangerous substances (Seveso II).
|
34. |
The Government Decision transposing the SEVESO II Directive
as drafted and approved by the Government at the end of 2002, but as at February 2003 it
had not yet been published.
|
35. |
"The Governments Strategy concerning the
Development of Local Public Services of Communal Husbandry", Government of Romania,
Ministry of Public Administration, Bucharest, 2001 at p9.
|
36. |
Ibid at p7.
|
37. |
Apele Romane was a joint-stock company owned by the State but
self-sufficient. Its operation costs were covered by water charges paid by water users.
|
38. |
Governmental Decision of 20 September 2002.
|
39. |
A 2002 PHARE project (0.8 MEUR) will assist establishment of
an informational system and a database for water management purposes. A bilateral project
financed by the Netherlands is assisting the Mures river basin to implement the Water
Framework Directive provisions.
|
40. |
There are various causes of this contamination such as
chemical fertilisers used on arable land or waters charged with nitrates being evacuated
into rivers and lakes. See "The Environment and Sustainable Development from Rio to
Johannesburg, "Romanian Ministry of Waters and Environmental Protection, 2002 at p17.
|
41. |
Council Directive 91/676/EEC on Nitrates from Agricultural
Sources.
|
42. |
Made up of representatives from MWEP, Ministry of
Agriculture, Food and Forestry, and Ministry of Health and Family.
|
43. |
Council Directive 98/83/EC on the Quality of Water intended
for Drinking implemented in Romania by Law 458/2002 Concerning the Quality of Drinking
Water, (OJ No 552/29.07.2002).
|
44. |
Council Directive 91/271/EEC concerning urban waste water
treatment.
|
45. |
"The Governments Strategy concerning the
Development of Local Public Services of Communal Husbandry", Government of Romania,
Ministry of Public Administration, Bucharest, 2001at p24.
|
46. |
Table on approved and proposed priority environmental
projects in the water sector for ISPA financing.
|
47. |
Council Directive 96/62/EC on ambient air quality assessment
and management.
|
48. |
The cost estimates assume that all investment will be carried
out during the first year and include running costs for four years (2003-2007). See PHARE
project RO 9907-02-01: Pre-accession Impact Studies, "Assessment of institutional and
administrative implementation requirements of selected EU Directives Air Framework
Directive and Daughter Directives".
|
49. |
The preliminary assessment campaign started under the IDAQ
project for two agglomerations (Bucharest and Ploiesti) and for one mini-zone Valea
Bistritei, along Bacau and Neamt counties.
|
50. |
A short-term effort to design a third project under the PHARE
2002 programme - "Improvement of the National Air Quality Monitoring Network"
will provide equipment and the design of an EU-compliant National Air Quality
Monitoring Network (total budget 3.07 MEUR). A PHARE 1999 Cross-Border Cooperation project
"Joint air quality monitoring system on the Romanian/Bulgarian boundary towns on
Lower Danube" (total value 1,7 MEUR) provided equipment for AQ monitoring of four
localities on the Romanian side of the Danube and four correspondent localities on the
Bulgarian side. The joint monitoring system should ensure continuous AQ data exchange in
the border area and provide AQ information to the public through display panels placed in
the main areas of participating towns.
|
51. |
A PHARE 2002 CBC is expected to provide the necessary
equipment (total budget 2.53 MEUR).
|
52. |
Ministerial Order no. 745/2002 of 30.08.2002 on establishing
agglomerations and the criteria for classifying agglomerations and zones for air quality
assessment in Romania.
|
53. |
The establishment of AQ agglomerations has been done with the
support provided by the Danish funded project "Assistance to Romania on
Transposition and Implementation of EU AQ Directives" (the IDAQ Project). The project
has also submitted to MWEP a proposal for establishment of 10 AQ zones following a Seminar
involving all 42 EPIs as well as other stakeholders. The proposal was based on AQ
conditions similarities in the neighbouring counties.
|
54. |
This was provided in the Ministerial Order no. 592/2002 of 10
June 2002 on approval of the Regulation setting limit values, threshold values, and
assessment criteria and methods for sulphur dioxide, nitrogen dioxide and oxides of
nitrogen, particulate matter (PM10 and PM2.5), lead, benzene, carbon monoxide and ozone in
ambient air.
|
55. |
Council Directive 94/63/EC on volatile organic compounds
(Stage One).
|
56. |
Position Paper of Romania for Chapter 22 Environmental
Protection, 18 October 2001, at page 8.
|
57. |
Ibid.
|
58. |
As provided in Governmental Decision No. 568/2001 setting up
the technical requirements for limiting the VOC emissions as a result of storing, loading,
unloading and distribution of petrol to terminals or petrol stations.
|
59. |
Governmental Decision No. 732/2001 on setting up the
conditions for placing on the market of petrol and diesel fuel.
|
60. |
"Supporting the Accession Process in the Applicant
Countries of Central and Eastern Europe, plus Cyprus, Malta and Turkey: Progress
Monitoring Report Year 5 2002", by Milieu Limited, at Annex III/10 Romania, on
Air Quality.
|
61. |
This plan will then be updated every 5 years.
|
62. |
The Governments Strategy concerning the Development of
Local Public Services of Communal Husbandry", Government of Romania, Ministry of
Public Administration, Bucharest, 2001 at page 8.
|
63. |
Council Directive 1999/31/EC on Landfill of Waste.
|
64. |
These landfills are at Sighisoara, Constanta, Bucuresti
Vidra, Bucuresti- Giulesti, Sarbi, Piatra Neamt, Braila, Ploiesti, Sibiu.
|
65. |
UNECE Environmental Performance Review for Romania (2001), at
page 111.
|
66. |
Council Directive 86/278/EEC on Sewage Sludge.
|
67. |
Council Directive 2000/76/EC on the Incineration of Waste.
|
68. |
According to Romanias National Strategy for Waste
Management.
|
69. |
Council Directive 94/62/EC on Packaging and Packaging Waste.
|
70. |
The cost assessment for the implementation of this directive
is part of a PHARE 2000 program with a French twinning component.
|
71. |
Carried out by EPIQ with USAID financing.
|
72. |
Governmental Decision No 1057/2001 and Emergency Ordinance No
78/2000.
|
73. |
Council Directive 2000/53/EC on end-of-life vehicles.
|
74. |
ACAROM is the Romanian Vehicle Constructors Association.
|
75. |
Evaluation by Environmental Policy Unit of MWEP.
|
76. |
"National Strategy for Environment ISPA
Implementation", MWEP, May 2001.
|
77. |
The Danube Delta National Research Institute assists in
undertaking research and implementing ecological restoration works in the area. In
addition, Romania takes part in the Green Corridor Programme for the Danube together with
Bulgaria, the Republic of Moldova and Ukraine, which intends to protect and restore the
Danube Delta Biosphere Reserve.
|
78. |
Law 462/2001.
|
79. |
The Council of Europe "Convention on the Conservation of
European Wildlife and Natural Habitats", Bern, 19.IX.1979, European Treaty
Series/104. The Convention was ratified by Romania via Law No 13/1993.
|
80. |
Council Directive 98/81/EC on Contained Use of GMMs.
|
81. |
Council Directive 2001/18/EC on Deliberate Release of GMOs.
This directive was transposed by Government Ordinance No 49/2000 on Obtaining, Testing,
Uses and Com-mercialisation of GMOs Resulting from Modern Biotechnology. The authority
responsible for implementing the Contained Use of GMMs Directive is the Public Central
Authority for Environmental Protection. This authority liases with, and is provided with
technical expertise from, the Bio-Safety Commission.
|
82. |
Council Directive 86/609/EEC on Protection of Animals Used
for Experimental and Other Scientific Purposes Directive. Governmental Ordinance 37/2002
regarding the protection of animals used for experimental and other scientific purposes.
|
83. |
Council Regulation EC/2037/2000 on Ozone Depleting
Substances.
|
84. |
Currently, Romania acts in accordance to the Art. 5 of the
Montreal Protocol, which stipulates ten years derogation from the application of control
measures, set down by Member States to the Protocol, compared with the developed states.
However, in its 2001 Position Paper Romania commits that in order to adopt the Regulation
No 2037/2000 upon accession, it will comply with the time limits for ODS consumption
freeze and phasing-out, which are specific to the phasing-out scheme for developed
countries.
|
85. |
Commission Regular Report on Romanias Progress towards
Accession 2002, at page 105.
|
86. |
Council Regulation EEC/2455/92 on Import and Export of
Dangerous Substances.
|
87. |
For example, all Member States adhere to the safety
principles and practices recommended by international organisations such as the
International Atomic Energy Agency (IAEA), and are contracting parties to the Nuclear
Safety Convention.
|
88. |
Council Directive 96/29/EURATOM on Basic Safety Standards.
|
89. |
Council Directive 89/618/EURATOM on Information to the
Public.
|
90. |
Council Directive 97/43/EURATOM on Health Protection of
Individuals in relation to Medical Exposure.
|
91. |
Council Regulation 3954/87/EURATOM, on maximum levels of food
contamination, as amended.
|
92. |
Council Directive 86/594/EEC on Airborne Noise Emitted by
Household Appliances. Transposition was done via Governmental Decision No 672/2001, which
came into force in February 2002 and sets up the conditions for marketing household
appliances, depending on the level of airborne noise.
|
93. |
Drafting has not yet begun for the Governmental decision
intended to transpose this Directive, but the Governmental decision to appoint the
competent authorities for this Directive is being prepared.
|
94. |
Romania ratified the Kyoto Protocol via Law No 3/2001.
|
95. |
Council Decision 93/389/EEC, as amended by Decision
99/296/EEC.
|
96. |
Romania submitted its Second National Communication to the
UNFCCC in April 1998.
|
97. |
National Round Table on the Environment and the Economy. |
The integration of environmental considerations into other policy areas,
especially economically important sectors such as energy, industry and agriculture, is a
legal obligation under the Treaty of Amsterdam. The obligation stems from recognition of
the inadequacy of environmental policy per se for tackling the underlying causes of
environmental deterioration.
To date, there is little EU legislation setting specific measures with respect to
sectoral integration. However, the EUs Sustainable Development Strategy adopted at
the June 2001 European Council in Göteborg reaffirmed the importance of integrating
environment into all relevant Community policy areas including via sector strategies.
Member State efforts to integrate environmental concerns into other areas are also
important guideposts for measures in the candidate countries.
Like many Member States, Romanias efforts to take environmental concerns into
account in developing policies in the energy, transport and agricultural sectors are not
very advanced. The 2002 Regular Report on Romanias Progress towards Accession
concluded that integration of the environment into other policies was "hardly
progressing". It noted, however, that the Inter-Ministerial Committee responsible for
co-ordination to ensure that all concerned sectors were taking environment into account
had met in February 2002 for the first time since 1999. The roadmap for Romania included
as a short-term benchmark the need to reinforce structures and mechanisms to ensure
integration of environmental protection requirements into the definition and
implementation of all other sectoral policies with the ultimate aim of promoting
sustainable development.
4.1 Energy
As the largest importer and the second largest consumer of energy in the world, the
European Union is a key player on the international energy market. These trends are likely
to be reinforced after enlargement, even though some candidate countries are energy
producers, e.g., Romania for oil and gas. But to ensure a secure and competitive
energy market, sustainability is needed. Priorities for integration of environmental
considerations into this sector are therefore the improvement of energy efficiency,
promotion of the use of renewable energy, and internalisation of environmental and other
external costs.
The energy sector is by far the largest contributor to air pollution in Romania.
Power generation is based almost 50/50 on domestic coal (hard coal and lignite) and
natural gas. The change to natural gas is going slower than first forecast in the early
1990s, due to social difficulties in the coal-mining regions and the failure to create
alternative jobs to compensate for the loss of mining industry jobs.
Though energy consumption in Romania has decreased regularly since the early 1990s,
energy is still subsidised at all levels from exploration to consumption.
Because of the very high energy intensity of the national economy around 8 times
that of the average Member State there is great scope for energy efficiency
improvement in Romania. In 1998, Romanias energy intensity level was 58,400 Btu per
USD (1990). By comparison, Germany achieved energy intensity of 7,300 Btu per USD (1990).
It is estimated that "no-cost" energy saving measures could cut present energy
consumption by 15%.
The EU Directive on Renewable Energy sets an indicative target for the contribution of
electricity produced from renewable energy sources to 12% of gross electricity consumption
at Community level by 2010. Romania needs to begin taking active measures in order to
contribute to meeting that target, since renewable energy sources play no role in current
power generation.
The 2002 Regular Report notes Romanias lack of progress in taking environmental
considerations into account in its energy policies. It specifically mentions that recent
medium-term and long-term energy strategies focus on increasing energy production without
considering the impact on the environment or the potential for improving energy
efficiency.98
The Romanian Agency for Energy Conservation has only very limited financial and human
resources for promoting energy efficiency, and this lack of resources is cited by the 2002
Regular Report as indicative of the low priority given by Romania to date to energy
efficiency issues. Another major obstacle is lack of investment to boost efficiency of
production and distribution networks. To address this need, in October 2002 Romania
established the Fund for Romanian Energy Efficiency (FREE) with support from the Global
Environmental Facility and the World Bank. FREE will be a revolving fund aimed at
providing medium-term financing (2-3 years initially) for projects between 98,765 EUR and
1,481,481 EUR. The overall expected program life is 8 years.
4.2 Industry
EU industrial policy seeks to enhance competitiveness, thus achieving rising living
standards and high rates of employment. Its aim is to speed up adjustment to structural
change and to encourage industrial innovation and the development of undertakings
throughout the Community. In order to cope with the pressures within the internal market
of the Union, candidate countries need to achieve a certain level of competitiveness by
the time of accession, while respecting the standards of the EU regarding environment
protection.
Romania lacks the resources to confront its industrial pollution problems and protect
its environment adequately.99 As a
result, Romania continues to suffer from high levels of industrial air pollution, as well
as water pollution by industrial and municipal wastewater discharges, agricultural runoff,
and insufficient treatment of toxic pollutants discharged by industry into municipal
sewers.
Romanias privatisation programme has included efforts to bring in strategic
foreign investment and technology transfer for upgrading of Romanian industries, but
continues to proceed at a slow pace.100 Moreover,
privatisation has not always succeeded in overcoming a facilitys legacy of
under-investment and past pollution damage. The 1998 priva-tisation of Copsa Mica to a
Greek corporation, for example, included strong commitments to invest in restructuring and
environmental needs. But as of 2002, less than 10% of the amount proposed for
environmental improvements had been spent,101
even as greater industrial activity at the factory had brought polluting emissions
back to 1980s levels, when the environmental plight of Copsa Mica first came to
international attention.
The 2002 Regular Report recognises that Romania has made progress in developing a
coherent industrial policy, but notes that progress with privatisation has been relatively
slow. Moreover, Romania continues to lag behind other candidate countries in its ability
to attract the foreign direct investment needed to modernise its industries and to tackle
industrial pollution problems.
In November 2001, Romania split responsibility for privatisation between the Authority
for Privatisation and Management of State Assets (APAPS) and a new Office of State
Ownership and Privatisation in Industry (OPSI) within the Ministry of Industry. OPSI took
over responsibility for privatisation of companies in strategic sectors (energy, oil and
gas, mining, defense), representing 75% of total state assets.
In March 2002, new legislation was adopted with the aim of speeding up the
privatisation process, but in the year since its creation, OPSI has not yet carried out a
privatisation. Thus privatisation and restructuring remain areas where major additional
efforts are still needed. At the same time, Romania needs to pay careful attention to how
environmental pollution problems are handled in the privatisation process, so its efforts
to restructure industry in the short term do not exacerbate long term pollution problems.
In the long term, Romania's commitment and ability to protect its environment from
industrial pollution depends on how it addresses such interwoven problems as insufficient
financing mechanisms, lack of analytical capacity for development and implementation of
sustainable environmental management, and inadequate resources for monitoring,
enforcement, and information dissemination at local level.
4.3 Agriculture and forestry (including SAPARD)
The Common Agricultural Policy (CAP) of the EU, created at a time when Europe was in
deficit for most food products, has come under fire in recent years for its emphasis on
subsidies tied to agricultural productivity. The CAP is currently linked to problems
ranging from environmental pollution stemming from overuse of chemical fertilisers and
pesticides to subsidised agricultural surpluses sold on the world market at prices
undercutting the products of other countries. Agri-environmental measures introduced in
1992 have aimed to encourage environmentally sound agricultural practices, but the
financial support for such measures represents only a fraction of the overall CAP support.
Romanias challenge is to develop an effective capacity to elaborate and implement
agricultural policies compatible with the CAP, and additionally to incorporate
environmental protection within these policies.
Agriculture is important for the Romanian economy, accounting in 2001 for 14.6% of
Romanias gross value. Approximately 62% of Romanias total land surface is
agricultural, and from this, 63% is arable, 33% pastures and meadows, 2% orchards and 2%
vineyards. Romania is the largest maize producer in Europe after France, and it has about
6,370 thousand hectares of forest.
During communism, 90% of agricultural land was owned by the State, with 55% farmed via
collective farms. Following the collapse of communism, most collective farm land was
privatised, creating 4 million private households farming newly privatised plots. Larger
scale farming still exists, however, with 40% of land being used by family associations or
by farms remaining under state ownership.
For most small farmers, the impacts of economic transition have rendered most
agricultural inputs such as chemical fertilisers and pesticides unaffordable. The de
facto situation today of widespread areas farmed without chemical inputs represents a
unique opportunity for Romania to tap into the Western European market for organic foods,
if it could set in place the structures needed to certify its agricultural products as
organic and for timely distribution.
As in other countries, large-scale agricultural production poses particular
environmental problems. Large pig farms generate large amounts of manure which have led to
effluents as much as "100 times higher than the limits set in the water permit"102 and are a major source of heavy
continuous pollution of the waters in the region". These pig farms also cause local
air pollution. Romania will need to ensure that the measures required under the Nitrates
Directive to prevent this type of pollution are set in place.
The 2002 Regular Report recognizes Romanias progress in harmonizing its
agricultural and agri-environmental policies with the EU requirements, and notes recent
initiatives demonstrating that Romania is moving towards the development and
implementation of a coherent rural development policy. For example, in 2000,
Romanias Agency for Regional Development drew up a National Plan for Agriculture and
Rural Development under the pre-accession EU programme SAPARD. The emphasis is on
improving product processing, marketing and quality control, as well as veterinary and
plant-health controls, while ensuring respect for the environment. In particular, 20% of
the SAPARD funding will be allocated to rural communities in order to help fight against
drought. Measure 3.5 of SAPARD concerns forestry specifically, and puts in place measures
to support reforestation programmes.
On the other hand, changes to Romanias agricultural policy in 2002 replaced an
earlier support scheme targeting small family farms with a direct payment system for
several agricultural crops and a premium system for animal products. This has the effect
of making commercial farms eligible for domestic support, while family farms can receive
only free consultancy services and incentives for organic farming. The 2002 Regular Report
notes that focusing domestic support on a small percentage of large-scale commercial farms
could have negative social and economic implications for rural communities, and that
Romanias support policy should give much more consideration to rural development.
The Ministry of Agriculture, Food and Forests and the Ministry of Waters and
Environmental Protection cooperate with a view to integrating ecological concerns into
agriculture, but a recent UNECE report noted that this cooperative relationship did
"not seem to be all that effective". The opportunities for developing an
environmentally sound agricultural economy are strong in Romania, if the right policies
and support pro-grammes are set in place.
4.4 Transport, including infrastructure (ISPA)
Transport is a crucial sector in order to ensure smooth movements of people and
economic operators within the EU, and also with the outside world. But sustainable
transport policies are needed to address rising volumes of motor vehicle traffic and
increased levels of congestion, noise and pollution. The 2001 European Council in
Göteborg noted the need for actions to encourage the use of environment-friendly modes of
transport as well as full internalisation of social and environmental costs. It
particularly noted the need to de-couple transport growth from growth in GDP, in
particular by a shift from road to rail, water and public passenger transport.
Romania faces particular challenges in this sector. Since the transition to a market
economy in the early 1990s, Romania has witnessed a tremendous increase in the number of
passenger cars (more than 75% increase in motor vehicles between 1990 and 1997), and a
decline in the development of public transport. The share of freight transported by rail
started to decline some twenty years ago, with road transport taking a larger share.
In 1997, the transport sector contributed 50% of the total emissions of NOx and about
20% of other air pollutants. Assuming that no new measures are implemented, CO2 emissions
from transport are expected to increase by about 50% between 1995 and 2010.103 However, total emissions of lead have
slightly decreased over the years, due to the step-by-step introduction of unleaded petrol
and the gradual replacement of older cars by more modern vehicles.
Romanias ability to change these trends will depend on the policies and
programmes set in place for rehabilitation and strengthening of its transportation
infrastructure, and to link that infrastructure to the EUs transport network as an
important element for economic growth and the internal market. The EU programme to develop
a Trans-European Transport Network (TEN) linking the regions and national networks of the
Member States is key here. In 1996, the EU initiated a process of Transport Infrastructure
Needs Assessment (TINA) to coordinate the development of an integrated transport network
in the CEE candidate countries, including Romania. The EUs Instrument for Structural
Policies for pre-Accession (ISPA) has earmarked 50% of its funds for transport
infrastructure, giving priority to investments related to integration of candidate country
transport with that of the EU and the future TEN.
The construction of new transport infrastructure in Romania requires an environmental
agreement with the Ministry of Waters and Environmental Protection and the local EPIs.
Although applications for environmental agreements are subject to an environmental impact
assessment (EIA), to date there has been no strategic assessment (SEA) of the overall
environmental impact of the proposed infrastructure. Issues to consider should include,
e.g., the affect of planned transport infrastructure projects on the future development of
protected areas and corridors or whether the right balance between road and rail
infrastructure is proposed. A first step would be for the MWEP to prepare a map of
Romanias future network of protected areas, to guide decisions on transport
infrastructure trajectories. It would also be useful to strengthen the EIA process in
general, including structures for public participation, to ensure that environmental
issues are fully taken into account in decisions concerning transport infrastructure.
98. |
The national medium-term strategy for Romanian energy sector
development 2001-2004, approved by a 2001 Government Decision, limits its discussion of
policies for reducing environmental impact from the production, transmission, distribution
and consumption of energy mainly to energy efficiency.
|
99. |
See <http://www.eia.doe.gov/emeu/cabs/romaenv.html>.
|
100. |
Romanias chemical companies and thermal power plants
have not yet been privatised (though some district heating plants have been transferred to
municipalities). The furniture, textile, leather, cement, fertiliser and car manufacturing
industries are completely privatised, while metallurgy, oil refineries, and non-ferrous
metallurgical plants (Copsa Mica & Baia Mara) are mostly privatised.
|
101. |
The compliance programme specified in the privatisation
contract had specified moder-nisation of the existing installations for sulphuric acid at
an expected cost of 3 MUSD. This was later revealed to be impossible, with the only other
viable solution being to build an entirely new installation for 30 MUSD.
|
102. |
UNECE Environmental Performance Review of Romania 2001, at
page 161.
|
103. |
National report to the Secretariat of the United Nations
Framework Convention on Climate Change. |
In the negotiations between Romania and the European Union, administrative
capacity has been one of the top items on the agenda. After the Commission called for a
fundamental structural reform of the public administration, the Romanian Government
adopted a "General Strategy Regarding the Acceleration of Public Administration
Reform" in September 2001. The 2002 National Action Plan for Administrative
Strengthening prepared jointly with the EU lays out an extensive list of measures to be
taken as part of Romanias pre-accession preparations, including for the Environment
Chapter.
This section looks more closely at Romanias capacity to manage the task of
implementing the EU environmental requirements, including the challenge of financing the
necessary investments in environmental protection infrastructure.
5.1 Romanias Environmental Management Structure
Romanias administrative challenge is generally acute, given the severe resources
constraints under which all of its civil servants operate. Though all ministries were
re-structured in 2001, including the Ministry of Water and Environmental Protection
(MWEP), at the same time a 25% cut was made in the number of civil servants. This reduced
the already low level of administrative capacity and left a number of ministries, such as
the MWEP, severely understaffed. The restructuring itself may have been needed in some
areas, but the associated staff changes can sometimes have a severe impact on efficiency.
Moreover, the generally low salaries make it difficult to attract competent staff.
Romanias institutions for environmental protection have a relatively recent
history. The 2001 Regular Report notes that the experience of most agencies with
responsibilities for environmental management is rather limited, though the level of
technical expertise is generally high.104
5.1.1 Ministry of Water and Environmental Protection (MWEP)
The central public authority for environmental protection is the Ministry of Water and
Environment Protection (MWEP). It makes policies in the area of water and environmental
protection at national level and has the main responsibility for implementing the
environmental acquis. The MWEP draws up strategies and the specific regulations for
developing and harmonizing environmental protection activities into the general framework
of the Government policy, and co-ordinates the implementation of environment-related
government strategies.
The MWEP has established a Department with specific responsibilities for European
integration. This Department coordinates activities on legal transposition of the
environmental acquis communautaire and on implementation of the new legislation.
The Department also has a Unit for the Coordination of the Implementation of the
Structural Pre-accession Instrument (ISPA).
In November 2001, a decision was made to establish an "Environmental Guard"
using existing staff and budgetary resources from the national and local levels (see
section below on enforcement). In 2001, the Ministry also established a Directorate with
specific responsibilities for waste and hazardous substances management, in view of the
complexity of the actions needed to comply with the EU requirements in these areas.
Another administrative reform may be pending. The Minister has announced his intention
to establish a National Environmental Protection Agency (NEPA) by mid-2003. The NEPA would
not be political; its main task would be to carry out implementation, including the
monitoring and central database management now carried out by ICIM. The Ministry would
remain a policy-setting body. The move to establish a NEPA as a permanent government
authority could help bring more stability to some of the environmental management
functions that need to be carried out at central level. However, it remains to be seen
whether sufficient resources will be allocated from the national budget for the NEPA to
discharge the role foreseen for it.
The following central-level institutions under the MWEP are also important:
 | National Research-Development Institute for Environmental Management (ICIM) |
 | National Administration Romanian Waters ("Apele Romane") responsible for
water management plans and programmes and, through its 11 branches corresponding to the 11
river basins, for enforcing water legislation and policy. |
 | National Institute for Meteorology, Hydrology and Water Management provides
technical support in air quality and emission control, water quality, radioactivity, data
collection and emissions inventory |
 | Romanian Standards Institute responsible for EU norms |
 | Romanian Research Marine Institute and the R&D Institute of the Danube Delta |
 | National Commission for the Control of Nuclear Activities (CNCAN) |
5.1.2 The Environmental Protection Inspectorates
The 42 county-level Environment Protection Inspectorates (EPI) are responsible for the
implementation, monitoring and enforcement of legislation. The EPIs were established in
2001, following the reorganisation of the former regional Environmental Protection
Agencies. Each inspec-torate has within its structure a Unit for development of capacity
to elaborate and participate in the identification and implementation of Romanias
approximation strategies and the Community and international programmes. Each EPI also has
a Department for Nature Protection and Protected Areas, a Department for Waste and
Hazardous Substances Management, a Department for Integrated Monitoring of Environment
Media, and a Department of Ecological Control and Monitoring of Environment Investments.
A 2001 study on administrative capacity for environmental protection carried out for
the European Commission105 found
co-ordination between the national (the MWEP) and county level (the EPIs) to be
inadequate. In particular, it noted a lack of communication and a lack of training. The
staff in Romanias EPIs often had a poor understanding of the requirements of EU
legislation, and in particular gave inadequate attention to the technical (and policy)
implications surrounding permitting and inspection.
To help upgrade the EPIs and to provide better co-ordination, the MWEP plans to develop
a regional-level administrative structure comprising 8 to 11 regional EPIs. A PHARE
technical assistance project started up in September 2002 to assist the MWEP to decide on
the best conformation of this regional structure, and to provide training and equipment to
improve capacity of the EPIs. The PHARE project will decide whether to create a separate
regional structure to group the EPIs, or to give certain EPIs a regional responsibility to
co-ordinate adjacent EPIs. Another alternative under consideration is to group the EPIs
according to the 8 regional development zones (see section 5.4), the 11 river basins, or
the proposed "air quality basins" that are currently under discussion. The
eventual configuration of these regional EPIs will be decided in the course of the current
PHARE project.
These reorganisation measures are aimed at improving environmental management capacity
in Romania, but it should be noted that there have been few improvements in the overall
level of staffing. The Ministry of Water and Environmental Protection has only 170
persons, while the EPIs have a total of 1680 staff, an average of just 40 per EPI. By way
of comparison, Denmark a country with one-quarter the population of Romania
has some 2500 officials devoted to environmental protection, including 1000 officials
working at county level, and another 1000 officials at municipal level.106
In 2000, a new self-financing system was set up to provide financial support for the
EPIs. A ministerial order issued in 2000 established the register of works and services to
be performed by the EPIs and the related tariffs for these activities. This partial
self-financing of the EPIs has given them more resources, but there is some concern within
the MWEP that the self-financing may also increase the autonomy of the EPIs in ways which
may affect national co-ordination of policies and implementation.
5.1.3 Environmental monitoring
Monitoring the ambient environment is a major responsibility of the EPIs. The
monitoring effort is overseen by the MWEP, and supported by ICIM (the National
Research-Development Institute for Environmental Protection). At the same time, the
Ministry of Health and Family operates its own network of installations for ambient
monitoring for those parameters that might affect human health. This duplication of effort
can lead to confusion about which Ministry is responsible for enforcement actions when
health concerns are at play.
In addition, the National Administration "Apele Romane" administers a
National System of Water Quality Surveillance that inter alia monitors water
pollution sources such as wastewater treatment facilities. It levies fees for wastewater
discharged into waterways, as well as fines if emission limit values are exceeded.
EPI personnel responsible for monitoring have relatively good expertise, but operate
within severe constraints, e.g., poor equipment and limited staff. Capacity and expertise
is lacking for monitoring some of the additional pollutants introduced in the course of
approximation with EU law. The EPIs also do not have sufficient monitoring capacity to
assess compliance with permit conditions.
While enterprises are required to carry out self-monitoring according to parameters
established in the operating permit, few enterprises have expertise or laboratory capacity
to manage this accurately. Enterprises must alternatively conclude a contract with
accredited laboratories for sampling and data analysis. Romania does not yet have a system
for the accreditation of environmental protection and water management laboratories to
meet this pending demand.
5.1.4 Inspection and enforcement
Within the EPIs, around one-third of the staff are inspectors. They are responsible for
covering all media and, in an inspection of an installation, address all aspects of the
permit (i.e., integrated permitting). They plan inspections on a yearly basis, but carry
out additional inspections on special request and before authorising start-ups of
operations. As mentioned above, the recently organised Environmental Guard will be fully
in place by November 2002 to assume duties in this area. In particular the Environmental
Guard will:
- Control those installations with major impact on environment factors;
- Control economic operators carrying out activities subject to the EIA procedure;
- Follow environmental protection investments through all stages of execution;
- Participate in interventions aimed at elimination or decreasing of pollution effects as
well as prevention of accidental pollution;
- Obtain information and data from economic agents (companies) to become acquainted with
and to fight against environmental protection offences;
- Control and find violations of legal provisions in environmental protection field and
apply sanctions.
The Environmental Guard will also (a) collaborate with the police and/or gendarmerie on
fact-finding for legal infractions and bringing these facts to the knowledge of
authorities for penal investigation; (b) control applications for waste management and
recyclable materials recuperation; and (c) co-operate with other states or international
institutions on prevention, reduction and elimination of transboundary effects of
accidents or ecological catastrophes.
Though inspectors can levy administrative fines for failure to comply, fines are
usually too low to act as an effective deterrent. The level of fines has not been revised
for inflation since 1998.107 Inspectors
can also in theory close facilities, but economic pressures have limited the use of such
penalties. However, recently a section of the Doljchim Craiova chemical plant was closed
down after polluting the River Jiu with nitrates.
The inspection system benefits from the good professional expertise of most inspectors,
and from its flexibility of response to complaints and accidental pollution. But staffing
is limited, and laboratory equipment is poor. While the EPI inspectors can undertake basic
inspection activities, they lack adequate equipment for measuring emission levels and
other parameters. This hampers their effectiveness. As more complex permit requirements
are introduced in accordance with the IPPC and other Directives, the expertise of
inspectors will need to be improved.
In addition, the National Administration "Apele Romane" (the national
Romanian water company) carries out inspection and enforcement in the water sector, while
the Health Inspectorates under the Ministry of Health and Family are responsible for
inspection and enforcement for pollution affecting public health.
5.1.5 River basin management
As described more fully in section 3.3 on the water quality sector, Romanias
waters have been managed on the basis of river basins for many years. This structure has
recently been upgraded to prepare Romania for implementing the Water Framework Directive
requirements. A basin department for water management is now in place for each
hydrological basin, with responsibility for effective management of water resources
according to basin planning programmes. Moreover, Basin Committees have been established
comprising representatives of relevant national ministries, local public authorities and
NGO representatives. The basin departments are responsible for advising on schemes for
water management for each river basin, approving the classification by water quality of
the surface waters within each basin, and analysing and recommending financing priorities
to the central and local public administration.
The reorganisation of Apele Romane into a national administrative authority should help
to improve co-ordination but as the following organigramme shows, the structure for
overall management and coordination of water policy is complex.
The task ahead of co-ordinating among the many different ministries, agencies and local
offices will require strong negotiating skills and a coherent set of policies. Technical
assistance, especially from bi-lateral donors that have successfully dealt with similar
challenges, would be useful. In any case, investment support will be necessary for years
to come in order to implement the extensive EU requirements for water management.
Look here!
5.2 Other Ministries
A number of other national administrative institutions share competence for
implementing various environmental acquis. These include:
 | Ministry of Industry and Resources (MIR) responsible for legislation and policies
on fuel quality, car emissions, and noise. The National Institute for Industrial Ecology
(NIIE) under the MIR was created 18 years ago for treatment of industrial wastewater, and
remains involved in industrial pollution control. |
 | Ministry of Health and Family (MHF) shares responsibility for implementation of
various requirements under the Urban Waste-water, Drinking Water, Bathing Water, Nitrates
and Air Quality Directives. The Institute for Public Health, the MHFs expert agency,
carries out research and collects monitoring data on environmental aspects that could
impact human health, e.g., air pollution, radiation, noise |
 | Ministry of Agriculture and Forest (MAF) has an important role in implementing the
Nitrates and Habitats Directives. In particular, the Local Agriculture Agencies at county
level have responsibility for enforcing the Nitrates Directive requirements, while the
forestry administration is closely involved in nature protection efforts. |
 | Ministry of Public Administration (MPA) works closely with Roma-nian
municipalities, including on measures to support development of municipal infrastructure
such as wastewater treatment facilities and solid waste management. |
 | Ministry of Public Works, Transport and Housing has major responsibility for
ensuring that infrastructure required for the implementation of investment-heavy
Directives |
 | Ministry of Public Finance (MPF) makes decisions on the budget allocated to environment
protection, and therefore can veto MWEP initiatives (including requests for additional
administrative staff for implementation measures) |
 | Ministry of Development and Prognosis (MDP) in charge of the regional development
programmes, through the National Agency for Regional Development. Eight regional
development zones (formed by bringing together a combination of poor and better-off
counties) have been established to create capacity for management of economic development.
|
Coordinating mechanisms at national level include an Inter-Ministerial Committee
created by Governmental Decision that coordinates drafting of legislation. A permanent
Industrial Pollution Control Working Group has also been established with MWEP and MIR
staff to coordinate implementation of the IPPC Directive and related acquis. As
indicated in the new roadmap for Romania, coordination could still be improved between the
various ministries involved at central level. Better definition of the responsibilities
allocated to each ministry and better communications in general would help in this regard.
5.3 Local Governments
Another reform carried out in 2001 extended a process of decentralisa-tion of
government that had been started by the previous administration. A 2001 Law on Local
Public Administration defined the relationship between central and local government, and
prohibited central government from devolving additional responsibilities to the local
level without also providing the necessary financial means. It also set forth the right of
local authorities to levy local taxes and to elaborate and approve their own budgets.
Decentralisation can help free local authorities to raise additional funds for
municipal investment needs, but their capacity to raise user chargers or to levy taxes to
repay loans may be constrained by questions of affordability.
There are recent signs that administrative capacity is increasing at the local level,
e.g., some local authorities have contracted for foreign loans to develop local
infrastructure. In general, though, local governments have not yet developed sufficient
financial or administrative capacity to deal with the decentralisation of competencies,
and are not prepared for the burden of EU environmental infrastructure requirements.
It is the local authorities at county and municipal level, for example, that are
responsible for providing environmental services to the population. This requires setting
in place and managing the necessary environmental infrastructure, e.g., drinking
water supply systems, sewage collection networks, and wastewater treatment works. The
local authorities will need to identify and prepare environmental projects for investment.108 They also have responsibility for
granting development permits, which in some cases will require environmental impact
assessments.
The roadmap for Romania reflects on the urgent need to improve capacity at a local
level, including measures to improve the status of existing staff, to recruit new
inspectors, and to train them adequately.
Assistance is therefore particularly needed at the local level in Romania. A series of
DANCEE projects that supported the municipality of Piatra Neamt to develop a Local
Environmental Action Plan and priority environmental management infrastructure, including
a modern sanitary landfill, may provide useful lessons in this regard.
104. |
2001 Commission Regular Report on Progress of Romania Towards
Accession.
|
105. |
"Administrative Capacity for Implementation and
Enforcement of EU Environmental Policy in the 13 Candidate Countries", Service
Contract B7-8110/2000/159960/MAR/H1, by ECOTEC Research and Consulting in association with
the Institute of European Environmental Policy.
|
106. |
"Environmental Administration in Denmark", by
Mogens Moe, Ministry of Environment and Energy, Denmark, Environment News No 17, 1995, at
page 54.
|
107. |
"Administrative Capacity for Implementation and
Enforcement of EU Environmental Policy in the 13 Candidate Countries", Service
Contract B7-8110/2000/159960/MAR/H1, by ECOTEC Research and Consulting in association with
the Institute of European Environmental Policy.
|
108. |
From 2001 on, the local authorities have had responsibility
for implementing a number of investment-heavy Directives, such as the Urban Wastewater
Treatment Directive. |
As this report has already emphasised, compliance with the EU investment-heavy
requirements in the environment sector will pose an enormous financial burden for Romania,
the poorest of the CEE candidate countries. The burden will fall on the private sector as
well as on the public sector.
The best estimates to date for the public sector costs are those found in a 2001 study
by the Ministry of Public Administration (MPA). The MPA concerned about the demands
on local governments to provide services in accordance with EU standards undertook
the development of a Strategy as to how municipalities might rise to the challenge. The
Strategy109 consists of a short-term
strategy for 2001 2004, as well as a long term strategy until 2030. The year 2030
was selected as the date when Romania is likely to achieve the EU objectives set for
drinking water and urban wastewater treatment;110
however, Romania has requested transition periods of 2020 for these EU requirements.
The Strategy reports that 2030 was dictated by the limited possibilities of investment in
the sector, but this appears not to have been coordinated with Romanias team
negotiating the Chapter 21 requirements. The longer period set forth in the Strategy
suggests that Romania may well need transition periods longer than those requested.
The Strategy estimated that a total of 17.7 billion EUR would be required between 2002
and 2030 to rehabilitate the water and sewerage, urban heating and sanitation services.
This figure is divided between the different services as follows:
Water and sewerage in urban areas |
4.1 billion EUR |
Water and sewerage in rural areas |
5.4 billion EUR |
Centralised heating services |
6.8 billion EUR |
Sanitation (municipal waste management) |
1.3 billion EUR |
The following pie-chart shows the Strategys structure of fund granting allocated to
the various sectors:
The Structure of Fund Granting in Percentage
The strategy estimated that the yearly ratio of this investment would be spread as
follows:
2002 2017 |
942.9 MEUR per year |
2017 2022 |
403 MEUR per year |
2022 2030 |
193.6 MEUR per year |
The Strategy does not clarify whether these estimates of annual costs are only for
investments in infrastructure or whether they also include operating and maintenance
costs. If operating and maintenance costs are not included, the burden on Romanias
public sector would be significantly higher.
The MPA s Strategy stresses that the already constrained state budget cannot be
the primary provider of these investments, and suggests three ways of attracting
additional financing: (1) grants from the EU or other countries; (2) involvement of
private capital (i.e. public-private partnerships), and (3) loans from international
financial institutions (IFIs) or commercial bank credits for financing public services and
investments in local infrastructure.
The MPAs short-term strategy for the period 2002 2004 is to obtain the
942.9 MEUR from a variety of sources, as follows:
State (national) budget |
100.3 MEUR |
Local budgets |
90.3 MEUR |
EU and other grants |
551.7 MEUR |
Credits from international banks |
300.9 MEUR |
Private investment |
100.3 MEUR |
As this indicates, EU and bilateral grants remain the most important source of financing
(almost 50% of the total) for the public sector environmental infrastructure needed by
Romania, and predominantly the financing available through the ISPA programme. The table
on the next page shows the environmental infrastructure projects for which Romania will
receive significant ISPA grants during the first two years of ISPA financing (2000
2001).
During this initial ISPA period, Romania succeeded in putting enough viable projects
forward to receive its full allotment of ISPA financing for environmental infrastructure
projects. The first batch of projects put forward were already part of an EBRD effort to
extend credit to the larger Romanian municipalities for environmental infrastructure, and
considerable work on feasibility studies and financial analysis had already been done. But
the ISPA application process is technically demanding and complicated, requiring the
completion of full engineering feasibility studies and detailed financial analyses and it
was a major additional effort for the MEW to prepare adequate documentation for each
project to meet the EU requirements.
The DANCEE programme and other bilateral donors, including the US and Japan, were
needed to provide additional technical assistance (TA) at very short notice, to take the
existing information through the next stage of preparing the documentation for the ISPA
application. Danish consultants helped prepare the paperwork for the projects at Craiova,
Constanta, Arad and Piatra Neamt. Denmark also contributed co-financing for the Piatra
Neamt facility.
ISPA Grants for Environmental Infrastructure Projects in Romania (2000 2001)111
Project Name |
Total Cost of Project
(EUR) |
ISPA Grant (EUR) |
Drinking Water
pipes/plant |
Iasi: Upgrading of water & waste
system |
51,378,000 |
38,533,500 |
Drinking Supply and
Sewerage |
Pascani: Upgrading of water &
waste water system |
16,262,000 |
12,196,500 |
Targu Mures: rehabilitation of
drinking water supply |
27,909,400 |
20,932,050 |
Sewage
network/treatment plant |
Technical assistance for completion of
documentation |
1,810,000 |
1,357,500 |
Craiova: Rehabilitation of sewerage
network & wastewater |
70,378,000 |
52,783,500 |
Constanta: Sewerage & wastewater
treatment rehabilitation |
96,556,653 |
72,417,490 |
Timisoara: rehabilitation of
wastewater treatment technology |
48,080,000 |
34,136,800 |
Cluj: Rehabilitation &
modernisation of water supply |
46,755,800 |
35,066,850 |
Valea Jiului: Danutoni waste water
treatment plant extension |
9,680,000 |
7,260,000 |
Bralia: Integrated sewerage
development & wastewater |
59,877,400 |
44,908,050 |
Arad: Rehabilitation &
modification of sewerage network |
18,000,000 |
13,500,000 |
Foscani: Rehabilitation of the
sewerage network |
15,876,500 |
11,748,610 |
Oradea: Rehabilitation of the sewerage
network |
23,906,000 |
16,734,200 |
Waste management |
Piatra Neamt: waste management
programme |
13,846,000 |
10,384,500 |
As of October 2002, projects sufficient to meet Romanias ISPA allotment for 2002 had
not yet been agreed. Moreover, the process is not yet over even for the projects agreed in
2000-2001. Before the ISPA funds can actually be disbursed, the projects must be tendered
and contracted, in accordance with EU public procurement procedures. Romania has not yet
succeeded in getting any of its projects through this process, so that disbursement of
ISPA funds and actual construction of the infrastructure can begin. These difficulties
suggest a need for TA also in this area of project pipeline management.
Though the rules governing ISPA have recently been modified to allow smaller
municipalities to be eligible for ISPA funding (from 300,000 to 150,000 inhabitants), it
remains difficult for the smaller municipalities to apply for and successfully receive
funding. To remedy this, the MPA is in the process of establishing a Small and
Medium-sized Town Infrastructure Development Programme (SMTIDP), aimed at assisting 232
communities having populations of between 10 50,000, with a particular focus on
providing clean drinking water to small communities. SMTIPD will be funded 50% by PHARE
grant and from Romanian sources, and 50% from credit from the European Bank for
Reconstruction and Development (EBRD) and EIB. The 50% from PHARE and Roma-nian sources
will be split 75% PHARE, 25% Romania. The loans from EBRD & EIB will be paid back
through increased user charges. SMTIPD is to be a multiannual financing arrangement
operating from 2002 to 2010. In 2002, it will have 40 MEUR (15 MEUR from PHARE, 5 MEUR
from the Romanian government and 20 MEUR from International Financing Institutions).
One of the SMTIPD eligibility criteria is that the community must work in association
with other communities in the same river basin. There will be 60 EUR per person available,
so a town with 5000 persons will be eligible for 30,000 EUR under SMTIPD, for new
infrastructure or for refurbishment of old structures (e.g. replacement of delivery pipes
and refurbishment of pumps). The SMTIPD is a promising financial mechanism to support
Romanian municipalities in delivering safe drinking water, and may be a useful model for
other infrastructure needs, if additional donor and IFI funding can be secured.
Very small communities are eligible for assistance from the Rural Development
Programme. This is a five year programme which started in 2002 and with a total funding of
110 MEUR, largely financed by the World Bank (100 MEUR) and partly financed by Romania (10
MEUR) through in-kind contributions from municipalities.
To help Romania to meet its environmental investment challenge, an Environmental Fund
was established in 2001. A Government Decision approved the organisation of the
Environmental Fund, including 31 administrative positions. As of October 2002, three staff
persons are in place, and over 1.2 MEUR already collected from various fees and charges.112 Projects eligible for Environmental Fund
financing will include those aimed at control and reduction of air, water and soil
pollution, including the utilisation of clean technologies; natural resources protection;
management or recycling of waste; treatment and/or elimination of dangerous waste;
protection and conservation of biodiversity; education and awareness regarding the
environmental protection. Again, the funding that will be available through this mechanism
will be important, but not sufficient.
As section 2 has already described, according to the recent roadmap for Romania, EU
resources available will expand significantly between 2004 and 2006, and the extent of
such funding will be linked to absorptive capacity. But the significant assistance that
Romania has already required to prepare sufficient projects for the first two years of
ISPA indicates the difficulty that remains in meeting the technical requirements for
qualifying for ISPA funding. Romania is currently ill-prepared to take advantage of this
potential increase in funds.
Even if bilateral and other donors are prepared to support the additional technical
assistance that may be needed, the capacity of the MEW, MPA and the municipalities
themselves to absorb such assistance is still limited. Moreover, the EU Common Position on
Chapter 21: Regional Policy and Coordination of Structural Instruments, flags some
uncertainty on Romanias administrative capacity to implement Structural and Cohesion
Funds in the future.113 Romanias
financing challenge therefore includes the need not only to bring in the additional funds
from EU, bilateral, international and private sources, but to overcome the current limits
on its capacity to absorb such assistance.
109. |
"The Governments Strategy concerning the
Development of Local Public Services of Communal Husbandry", Government of Romania,
Ministry of Public Administration, Bucharest, 2001.
|
110. |
Ibid at page 4.
|
111. |
European Commission, Summary Information on the Third ISPA
Monitoring Committee Meetings, Romania, 23 24 April 2002, at page 74.
|
112. |
According to Law no. 293/2002 which finalised the legal
framework for the Environmental Fund, financing will come from: (a) a quota of 3% from the
incomes cashed by the economic operators which collect and capitalise ferrous and
non-ferrous wastes; (b) the cashed sums for pollutant emissions in the atmosphere which
affect the environmental factors; (c) the incomes cashed from the utilisation of new lands
recycling waste landfills; (d) a quota of 3% from the value of packaging commercialised by
the producers and the importers, except for those used for medicines; (e) a quota of 2%
from the value of dangerous chemicals traded by the producers and importers, except for
those used at medicines production; (f) a quota of 0,5% from the value of hazardous
chemicals traded by the producers and importers, utilised in agriculture; (g) a quota of
3% from the price of adjudgement of the wood bought from the National Woods Regia
and from other woods owners, legal or natural persons; (h) a quota of 1,5% from the cashed
value for trading tobacco finite products; (i) allocations from the state budget,
donations, grants, financial assistance from the part of natural and legal persons,
Romanian or foreign; (j) the sums cashed from the restitution of credits, interests, other
financial operations that use the financial sources of Environmental Fund; (k) financial
assistance from international organisms; (l) sums cashed from manifestations organised in
the benefit of Environmental Fund; (m) taxes cashed by the single bureaus when issuing the
environmental agreement/ authorisation for activities with a reduced impact.
|
113. |
European Union Common Position CONF-RO 9/02. |
The countdown towards accession started when the European Council in Copenhagen
decided in December 2002 that ten new members should be granted EU membership in May 2004.
The current Greek Presidency expects to host the signing of the Accession Treaties, on 16
April 2003 at the Acropolis in Athens.
For Romania and Bulgaria, the candidate countries pegged for the second wave of
enlargement in 2007, the European Commission proposed in November 2002 a new roadmap for
their progress towards achieving accession. The Copenhagen Council provided for new
dynamism in the enlargement: it committed to continue the pace of accession negotiations
on all remaining chapters, and allocated additional financial assistance with respect to
enlargement, depending on absorption capacity. The European Commission is in the meantime
drawing up additional plans for continuing pre- and post-accession support in the
environment sector.
With the target date of accession in 2007, Romania has a few more years to meet the
challenge of transforming its environmental management system to conform to the standards
now prevalent in Western Europe. It is now well advanced in its process of adapting its
legal system to transpose the EU obligations in the environment sector and is likely to
meet its goal of full transposition of all EU requirements as of 2000, by the end of this
coming year (2003).
But there is concern that the efforts of the Ministry of Waters and Environmental
Protection (MWEP) to complete legal transposition are out-pacing its capacity to set in
place the necessary administrative structures and systems to achieve implementation. In
certain sectors, it may be advisable to slow down the process of transposition, until
enough practical experience is gained to determine the best regulatory approach for
Romania and to ensure sufficient capacity especially among environmental officials at
local level. For example, the challenge of introducing integrated permitting to almost
2000 facilities will require local permitting officials to develop new skills in
evaluating whether a particular industrial facility has set in place the appropriate
measures to comply with the EU standard of best available techniques (BAT) for that
industrial sector.
The human and technical resources available at central and local levels for
environmental management are severely constrained. The MWEP has requested additional
budget for the staff it needs, but there are delays in getting approval for these
additional resources. This will be a difficult issue to resolve, since the Romanian
government is under great fiscal pressure. But if Romania is to move forward with EU
accession, it will need to demonstrate compliance with the EU environmental requirements,
including the capacity to administer these requirements, and the additional budgetary
resources will need to be made available to the MWEP.
Another major challenge will be to support the many municipalities throughout Romania
that will need to invest in construction and upgrading of infrastructure for drinking
water supply, sewerage and waste water treatment, and solid waste management.
The MWEP has not yet been able to carry out the long-term financial planning necessary
to show the EU how it will meet the EU investment-heavy requirements including for
municipal infrastructure within the requested transition periods. There has been and
continues to be significant technical assistance in this area, including Phare twinning,
but the MWEP is finding it difficult to make some of the policy decisions needed to set
investment priorities and the necessary financial planning is delayed. One of the
immediate challenges will be to prepare adequate Directive-specific implementation plans
and financing strategies for those EU requirements where transition periods have been
requested, so that Romania can achieve provisional closure of the Environment Chapter.
In the absence of reliable cost estimate information, it is difficult to predict just
how much additional funding Romanian municipalities will need to achieve EU compliance.
But it is a matter of concern that Romania is already experiencing problems in being able
to put forward sufficiently well-prepared projects to avail of the EU grant funding
available. The amount of EU grant funding is expected to dramatically expand for both
Romania and Bulgaria between 2004 and 2006, rising by an additional 20% in 2004, 30% in
2005 and 40% in 2006 compared to the average assistance received in the period 2001-2003.
The actual amount of funding will however depend on the absorption capacity of each
country, as well as the specific needs.
Romania expects to rely heavily on the EU grant funding in order to finance the
environmental infrastructure it needs. But the experience of the first two years of the
ISPA programme indicates that the Romanian institutions are not yet able to carry out the
technical tasks of project preparation without additional support. Part of the problem
rests with the technically demanding and rather rigid requirements of the EU for its grant
funding. The assistance provided by Denmark and other bilateral donors has been very
important in helping Romania to prepare its projects to qualify for the EU grant support.
It is likely to need continued bilateral assistance both technical assistance and
co-financing support for years to come to meet its investment challenge.
For Romania, the effort to comply with the EU environmental requirements will bring
significant benefits including reduced mortality, lower incidents of diseases, and lower
damages to buildings and crops. These benefits are estimated at between 1.27 and 9.8
billion EUR, the highest benefit amongst all the candidate countries expressed as a
percentage of GDP (30.7%). FN Data extracted from the Benefits of Compliance with the
Environmental Acquis for the Candidate Countries (ECOTEC, EFTEC, IEEP, Metroeconomica, THE
and Candidate Country Experts, 2001).
Thus it will be important not only for enlargement but for the humanitarian and
environmental benefits that will come from compliance with the EU environmental standards
for Romania to continue its pre-accession efforts in this area. The EU and other
donors will need to plan for provision of long-term technical assistance and financial
support, if the EU objective of a high level of environmental protection is to be achieved
throughout Romania.
I december 2002 afsluttede Det Europæiske Råd på mødet i København
forhandlingerne om den største udvidelse af Den Europæiske Union nogen sinde. Den 1. maj
2004 vil 10 af de 13 ansøgerlande blive en del af EU. På mødet i København bekræftede
Rådet, at tiltrædelsesproces-sen skal fortsætte for Rumænien og Bulgarien og satte som
mål, at de to lande bliver medlemmer i 2007. Inden det kan ske for Rumænien, skal landet
vise sin evne til at leve op kravene til medlemskab, herunder de miljømæssige krav.
Med 2007 som mål har Rumænien stadig nogle år til at møde den ud-fordring, der
ligger i at få sin miljøforvaltning til at leve op til de nu-værende krav i Vesteuropa.
Denne temarapport behandler de administrative reformer og udfordringer på
investeringsområdet, der ligger forude, hvis Rumænien skal opfylde EUs miljøkrav
og gennemføre til-trædelsesprocessen på tilfredsstillende måde. Rapporten drøfter
også de prioriterede handlinger og den bistand, som er nødvendig i den nærme-ste
fremtid, for at Rumænien kan arbejde hen mod acquis commun-autaire på miljøområdet
ét af de fællesskabskrav, som er allermest vanskeligt at opfylde.
Rapportens indhold er blevet efterspurgt af de rumænske miljømyndig-heder i et
samarbejde med Miljøstyrelsen, som en form for afslutning på det dansk-rumænske
arbejde. Formålet er at vise status og påpege mu-ligheder for løsninger af opgaverne.
Landet gør gode fremskridt i bestræbelserne med at tilpasse sit rets-system, så
EUs miljøkrav kan gennemføres i praksis, og landet vil sand-synligvis kunne nå
sit mål om at gennemføre alle EU-krav, der var gæl-dende i 2000, ved slutningen af
2003. Den hast, hvormed dette arbejde forløber, har faktisk rejst en vis bekymring for,
om denne indsats vil overhale Rumæniens evne til at tilvejebringe de administrative
struktu-rer og systemer, der er nødvendige, for at bestemmelserne kan gennem-føres i
praksis.
Den største udfordring for Rumænien på dette område ligger i de store krav til
investeringer i forureningskontrol i industrien, i kommunal infrastruktur til
drikkevandsforsyning, kloakker og spildevandsrensning, samt i håndtering af fast affald.
På linie med de øvrige ansøgerlande vil Rumænien ikke være i stand til at imødekomme
alle de investeringstun-ge krav inden tiltrædelsen. Landet har derfor bedt om at få
overgangs-perioder fra fem til 15 år efter 2007 for en række EU-krav, herunder i)
drikkevandsforsyning, kloakering og kommunal spildevandsrensning; ii) lossepladser,
emballageaffald og affaldsforbrænding; iii) industriel for-ureningskontrol, herunder
store forbrændingsanlæg; og iv) kontrol af udledninger af VOC under oplagring.
På grund af de historisk betingede og meget omfattende industrianlæg i Rumænien,
rejser EUs krav til kontrol med industriforurening særlige problemer.
Størsteparten af de 2.900 anlæg, som er omfattet af EUs IPPC-krav (integreret
forebyggelse og bekæmpelse af forurening), stammer fra før 1980, og der skal omfattende
anlægskapital til, før de kan opgraderes til Best Available Techniques (BAT).
IPPC-kravene medfører også væsentlige nye krav til de embedsmænd, som på nationalt
og regionalt plan er ansvarlige for godkendelser, påbud og forbud.
Blandt de vanskeligste og dyreste EU-krav, der skal gennemføres, er krav til
drikkevand og byspildevand, som anslås at ville koste op mod 15 milliarder Euro. Størst
byrde lægges på de lokale myndigheder, som skal bygge nye eller ombygge gamle kommunale
anlæg. Tilsvarende vil Rumænien ikke kunne leve op til EU-kravene til miljømæssig
forsvarlig affaldsforvaltning uden omfattende investeringer i moderne kontrolle-rede
lossepladser og forbrændingsanlæg, samt systemer for indsamling og genanvendelse af
emballageaffald. De samlede omkostninger i denne sektor anslås til næsten 676 millioner
Euro.
Rumæniens problemer med luftkvalitet viser sig fortrinsvis i de højt
industrialiserede områder. Med bistand fra Danmark og EU har Ru-mænien gennemført
indledende vurderinger af luftkvaliteten, opbygget kapacitet til avanceret
forureningsstyring, og påbegyndt udskiftningen af eksisterende automatiske målesystemer
i overensstemmelse med EUs krav.
Med sin geografiske beliggenhed og biologiske mangfoldighed fremby-der Rumænien meget
værdifulde naturområder og arter af planter og dyr, herunder området i Donau-deltaet
Danube Delta Biosphere Reserve som er det største og mindst ødelagte
vådområde i Europa. Selv om EUs naturbeskyttelsesbestemmelser ikke medfører store
investerin-ger, vil de pålægge landets myndigheder store administrative og økono-miske
byrder.
Rumænien er kommet langt i reguleringen af genetisk modificerede organismer (GMO) og
også i gennemførelsen af EU-kravene til be-grænsning af ozonlagsnedbrydende stoffer.
Men når det drejer sig om EU-krav til kemikalier, herunder farlige stoffer, er der stadig
langt igen. Rumænien får måske behov for målrettet hjælp til at efterleve eventuelle
fremtidige krav til afprøvning af kemikalier i henhold til EU-metoder og til vurdering af
dertil hørende risici, inden det kan afgøres, om der er brug for yderligere kontrol.
I Rumænien er ét kernekraftanlæg i drift, og et andet er ved at blive bygget, begge
af canadisk konstruktion, som anses for at opfylde vest-lige sikkerhedskrav. Rumænien har
allerede gjort meget for at omsætte og gennemføre EUs krav til
strålingsbeskyttelse, herunder EU-direktivet om sikkerhedskrav, oplysning til
befolkningen i tilfælde af hændelser med radioaktivitet, beskyttelse af eksterne
arbejdstagere, og medicinsk strålebelastning.
På klimaområdet har Rumænien forpligtet sig til at begrænse udlednin-gerne af
drivhusgasser med 8 % mellem 2008 og 2012 i forhold til refe-renceåret 1989. I
betragtning af de store muligheder for at øge energief-fektiviteten og nedskæring af
industriaktiviteter i forbindelse med den økonomiske overgang skulle det være muligt at
nå dette mål, samtidigt med at den økonomiske vækst fremmes. Under Kyoto-protokollens
Joint Implementation mekanisme (JI) har Rumænien underskrevet afta-ler om at tiltrække
investeringer, der skal skabe yderligere CO2-redukti-oner, med Schweiz, Nederlandene,
Norge, Østrig og Danmark. Teknisk bistand til Rumænien vil sandsynligvis være
nødvendig i flere år frem-over, hvis landet skal have den fulde fordel af
JI-mulighederne.
Som mange medlemsstater skal Rumænien gøre en stor indsats for at tage passende
miljøhensyn inden for energi-, transport- og landbrugs-politikken. Højt prioriterede
spørgsmål i energisektoren er fremme af vedvarende energi og forbedringer af
energieffektiviteten. På landbrugs-området skal miljøhensynene integreres i en
landbrugspolitik, som er forenelig med EUs fælles landbrugspolitik. Størsteparten
af de rumæn-ske landmænd har ikke råd til bekæmpelsesmidler og kunstgødning, og
landet har derfor en enestående mulighed for at komme ind på marke-det for økologiske
produkter, forudsat det råder over systemer til certifi-cering af sine økologiske
produkter og kan distribuere produkterne ef-fektivt. I transportsektoren er antallet af
biler steget med 75 % fra 1990 til 1997, samtidigt med at den kollektive transport er
faldet. Rumæniens evne til at ændre denne udvikling afhænger af landets politik og
programmer for genopbygning af transportinfrastrukturen.
Et andet afgørende spørgsmål er opbygningen af institutionel kapacitet, som er
tilstrækkelig til at administrere de store krav, EU stiller. Hele det rumænske
embedsværk arbejder under alvorlig ressourcemangel. Selv om alle ministerier blev
omstruktureret i 2001, blev antallet af ansatte samtidigt reduceret med 25 %, og derfor er
en række ministerier, herun-der miljøministeriet og dets 42 regionale inspektorater,
alvorligt under-bemandede. Ministeriet har ansøgt om flere midler til medarbejdere, men
godkendelser gives altid med forsinkelse. Hvis Rumæniens indsats forud for tiltrædelse
skal lykkes, skal der opbygges den nødvendige administrative kapacitet, og de nødvendige
midler hertil må bevilges.
Miljøministeriet har endnu ikke færdiggjort den langsigtede økonomiske planlægning,
som skal vise EU, hvorledes landet vil opfylde de store EU-investeringsbehov, herunder
også til kommunal infrastruktur. Hvis det skal lykkes at lukke miljøkapitlet, skal
Rumænien inden oktober 2003 udarbejde direktivspecifikke implementeringsplaner og
finansie-ringsstrategier for de EU-krav, hvor man har bedt om overgangsperio-der. Der skal
i den forbindelse udarbejdes oversigter over investerings-projekter og omkostninger
og realistiske planer for finansiering og opbygning af den nødvendige infrastruktur på
miljøområdet.
EU hjælper de øst- og centraleuropæiske ansøgerlande med infrastruk-tur og
kapacitetsopbygning gennem tre førtiltrædelsesinstrumenter. I perioden 2000-2002 har EU
givet tilsagn om at stille et beløb på 260 millioner Euro til rådighed for landet fra
PHARE (teknisk bistand og investeringer i fattige egne), 250 millioner Euro fra SAPARD
(udvikling i landbruget), og mellem 208 og 270 millioner Euro fra ISPA (større miljø-og
transportinfrastrukturprojekter).
Rumænien forventer i stort omfang at gøre brug af EU-støttemidler til finansiering
af den nødvendige miljøinfrastruktur. Men der er problemer med at fremlægge
tilstrækkeligt velforberedte projektansøgninger. Efter-som EU-støttemidlerne vil stige
kraftigt mellem 2004 og 2007 og nå op på en 40 % forøgelse i 2006, er det et problem.
Landet har været afhæn-gigt af bilateral bistand for at kunne opfylde de forskellige
betingelser for at kvalificere sig til EU-støtte, f.eks. forberedelse af teknisk
kræven-de dokumentation forud for ansøgninger til ISPA om infrastrukturpro-jekter.
Ydermere har Rumænien endnu ikke haft held til at få nogen af sine projekter gennem de
udbuds- og kontraktprocedurer, som er fast-lagt i henhold til EUs lovgivning om
offentlige indkøb, og udbetaling af ISPA-midlerne og opbygning af infrastruktur er endnu
ikke begyndt. Rumænien vil nok fortsat i de kommende år have brug for bilateral støt-te
både som teknisk bistand og som samfinansiering hvis landet skal leve op
til investeringskravene.
Teknisk bistand og investeringsstøtte er især nødvendig på lokalt plan, fordi kun
få kommuner har udviklet tilstrækkelig kapacitet til at imøde-komme EUs
infrastrukturkrav, f.eks. til drikkevandsforsyningssystemer, kloakering og
spildevandsrensning. En række DANCEE-projekter til støtte for kommunen Piatr Neamts
udvikling af lokale miljøhandlings-planer og til højt prioriterede
miljøforvaltningsstrukturer, bla. en moder-ne losseplads, kan give værdifulde erfaringer
på dette område. I hen-hold til regeringens strategi for støtte til Østeuropa 2002 vil
dansk bilateral støtte til Central- og Østeuropa ophøre, når EU udvides i 2004.
For Rumænien vil indsatsen for at opfylde EUs miljøkrav give store for-dele,
herunder mindsket dødelighed, færre sygdomstilfælde, mindre skader på bygninger og
afgrøder. Disse fordele skønnes at beløbe sig til 1,27-9,8 milliarder Euro, det
største i alle kandidatlandene udtrykt som procent af BNP (30,7 %).
Det er derfor meget vigtigt ikke alene for udvidelsen af EU, men også for de
menneskelige og miljømæssige fordele ved gennemførelsen af EUs miljøkrav
at Rumænien fortsætter bestræbelserne på miljøområ-det for at kvalificere sig til
EU-medlemskab. EU og andre donorer skal udarbejde planer for langsigtet teknisk bistand og
økonomisk støtte, hvis EUs målsætning om et højt miljøbeskyttelsesniveau skal
nås overalt i Rumænien.
AQ |
Air Quality |
BAT |
Best available techniques |
BATREF |
BAT Reference Documents |
CAP |
Common Agricultural Policy |
CEE |
Central and Eastern European |
DG |
Directorate General of the European Commission |
EBRD |
European Bank for Reconstruction and Development |
EDIS |
Extended Decentralised Implementation System |
EIA |
Environmental impact assessment |
EIB |
European Investment Bank |
EIONET |
European Environment Information and Observation Network |
ELV |
Emission limit values |
EOL |
End of Life |
EPI |
Environmental Protection Inspectorate (regional-level) |
EU |
European Union |
GD |
Governmental Decision |
EUR |
Euro |
GHG |
Greenhouse gases |
IAEA |
International Atomic Energy Agency |
ICIM |
National Research-Development Institute for Environmental
Protection |
IGC |
Intergovernmental Conference |
IPPC |
Integrated pollution prevention and control |
ISO |
International Standardisation Organisation |
ISPA |
Instrument for Structural Policies for Pre-Accession |
LCP |
Large Combustion Plants |
LEAP |
Local Environmental Action Plan |
LIFE |
The Financial Instrument for the Environment |
MAFF |
Ministry of Agriculture, Food and Forestry |
MEUR |
Million euros |
MPA |
Ministry of Public Administration |
MUDP |
Municipal Utilities Development Programme |
MW |
Mega watt |
MWEP |
Ministry of Water and Environmental Protection |
NEAP |
National Environmental Action Plan |
NEPA |
Proposed National Environmental Protection Agency |
NGO |
Non-governmental organisation |
ODS |
Ozone depleting substances |
PHARE |
Poland and Hungary Assistance to Restructure the Economy |
SAPARD |
Special Accession Programme for Agriculture and Rural
Development |
SMTIDP |
Small & Medium Towns Infrastructure Development
Pro-gramme |
TAIEX |
Technical Assistance Information Exchange Office |
TEMPUS |
Higher Education Co-operation Scheme between EU Member States
and Partner Countries |
UNFCCC |
United Nations Framework Convention on Climate Change |
UNECE |
UN Economic Commission for Europe |
UWWTD |
Urban Wastewater Treatment Directive |
VOC |
Volatile Organic Compounds |
WFD |
Water Framework Directive |
European Commission documents
 | Towards the Enlarged Union. Strategy Paper and Report of the European Commission on
the progress towards accession by each of the candidate countries", Brussels, 9
October 2002, COM (2002) 700 final |
 | 1999, 2001 and 2002 Regular Reports on Romanias Progress Towards Accession |
 | Commission Monitoring Report on Acccession negotiations with Romania, 7 June 2002 |
 | Enlargement of the European Union Guide to Negotiations |
 | The Communication Strategy of Enlargement |
 | Common Positions, Energy, Agriculture, Industry, Co-ordination of Structural Funds |
 | A Review of the Status of Nuclear Safety in the Central and East European Countries with
Special Reference to the Evaluation of the Situation in Romania by Simon Webster, European
Commission, Directorate-General for Energy and Transport |
 | March 2002 Eurobarometer Report on the Candidate Countries |
 | Supporting the Accession Process in the Applicant Countries of Central and Eastern
Europe, plus Cyprus, Malta and Turkey: Progress Monitoring Report Year 5
2002", by Milieu Limited for the European Commission, at Annex III/10 on Romania |
 | Roadmaps for Bulgaria and Romania, 13 November 2002, COM (2002) 624 final |
 | Presidency Conclusions, European Council, Copenhagen Summit (12-13 December 2002).
SN400/02 |
 | One Europe Agreement, European Council, Copenhagen Summit (12-13 December 2002).
SN369/02. |
Government of Romania documents
 | Position Paper of Romania for Chapter 22 Environmental Protection, for the
Intergovernmental Conference for the Accession of Romania to the European Union, October
2001 |
 | Revised National Programme of Adoption of the Acquis, Romania 2002-2006 (NPAA), June
2001 |
 | National Environmental Action Plan (NEAP) 1999 |
 | National Strategy for Environmental Protection 2000 2004 |
 | Revised Accession Partnership Agreement, Romania, adopted December 1999 |
 | 1995 Water Strategy, updated in 2000: Approximation Strategy for the Water Quality
Sector (currently under review) |
 | Medium-term Development Strategy of the Romanian Economy 2000 |
 | Action Plans to reinforce Administrative Capacity, 2002 |
 | The Governments Strategy concerning the Development of Local Public Services of
Communal Husbandry", Government of Romania, Ministry of Public Administration,
Bucharest, 2001 |
 | The Environment and Sustainable Development from Rio to Johannesburg, Romanian Ministry
of Waters and Environmental Protection, 2002 |
 | Joint Action Environmental Programme for the Danube River Basin, January 2001- December
2005 |
 | Second National Communication to the United Nations Framework Convention on Climate
Change, April 1988. |
Danish Ministry of Environment Documents
 | The Environmental Challenge of EU Enlargement in Central and Eastern Europe,
thematic report, Danish Environmental Protection Agency, 2001. |
 | Environmental Administration in Denmark by Mogens Moe, Ministry of Environment and
Energy, Denmark, Environment News No 17, 1995. |
 | Romanian-Danish Environmental Co-operation, Co-operation Development 1993 1998,
Danish Environment Protection Agency |
 | The Danish Environmental Support to Romania 1993 2001, Danish Environment
Protection Agency |
Other documents
 | United Nations Economic Commission for Europe, Environmental Performance Review of
Romania, Review Series No 13, 2001 |
 | Administrative Capacity for Implementation and Enforcement of EU Environmental Policy in
the 13 Candidate Countries, Service Contract B7-8110/2000/159960/MAR/H1, by ECOTEC
Research and Consulting in association with the Institute of European Environmental
Policy. |
 | Baseline Study: Romanian Approximation Strategy for the Industrial Pollution Control
Sector", by COWI & CarlBro International for the Romanian Ministry of Waters and
Environmental Protection, through the DANCEE programme, August 1999 |
 | Europe "Agreening", 2000 Report on the Status and Implementation of