Facilitated transport of pesticides

FIGURE 3.5. (A): TURBIDITY (T) VERSUS TIME MEASURED IN PLOT B DURING 4 HOURS FROM DECEMBER 11 1999 AT 10.00 P.M., AND (B): TURBIDITY (T) VERSUS TILE DRAINAGE FLOW AT THE TIME OF SAMPLING (FR). DATA FOR ALL TURBIDITY MEASUREMENTS PERFORMED IN PLOT A ( ) AND B (+) DURING SEASONS 1998/99, 1999/00, AND 2000/01. FIGUR 3.5. (A): TURBIDITET (T) VERSUS TID MÅLT FOR PLOT B OVER 4 TIMER FRA 11. DECEMBER,1999 KL. 22.00, OG (B): TURBIDITET (T) VERSUS DRÆNFLOW PÅ MÅLETIDSPUNKTET (FR). DATA FOR ALLE TURBIDITETSMÅLINGER UDFØRT I PLOT A ( ) OG B (+) OVER SÆSONERNE 1998/99, 1999/00 OG 2000/01.