Market information in life cycle assessment


Fuel
type
Plant
type
Effici
ency
Life
time
Product
per year
Capital
investment
Operation and
maintenance
Fuel
Total
cost
MW %
Yrs
MWh/yr DKK/
MW
DKK/
MWh
***
% of
investment
per year
DKK/
MWh
Calorific
value in
MJ/kg
Price
in
DKK/k
g
Cost in
DKK/M
Wh
DKK/
MWh
Hard
coal
400
47
30
1.75E6
8E6
110
3.2
59
25.1
0.28
84
250
Nat.
gas
15
36
25
6.6E4
5E6
82
2.5
59
39.6
(MJ/m3)
1.3
(/m3)
330
470
Nat.
gas
250
CC*
54
30
1.1E6
5E6
68
2.5
34
39.6
(MJ/m3)
1.3
(/m3)
220
320
Heavy
fuel oil
15
43
25
6.6E4
6E6
99
-
100** 40.6
0.69
140
340
Bio-
mass
250*
CFB
45
30
1.1E6
8E6
110
4
73
17.5
0.53
240
420
* CC: Combined Cycle in which a natural gas driven turbine and another
turbine driven from steam produced from the exhaust gas of the gas turbine.
CFB: Circulating Fluid Bed. Technology at experimental stage.
** Authors estimate. Total cost 250-320 DKK/MWh according to Hammar
(1997) excl. capital goods.
*** Includes a factor 1.8 on the values from the previous column to take into
account 6% interest on the investment over 20 years.
|