Guidelines on remediation of contaminated sites Appendix 4.10
|
1. Well no. __________________ Serial no. _________________ Carried out by: ________________ Year: ____________________ Owner: __________________________________________________ Address: _________________________________________________ _______________________ Telephone: _____________ |
||||||||
2. Sketch of well position: |
WELL: Surface level _______________________m Top of well casing level Depth to bottom, Well bottom level ___________________m Casing, diameter ___________________ m Screen diameter ____________________ m Screened interval ___________m -_____ m |
|||||||
1. Sketch of well construction: |
||||||||
Accessibility to water-level measurements: _________________________________________________________________ _________________________________________________________________ |
||||||||
Measurement data: |
Date of measurement |
|||||||
Water level, m below reference point |
||||||||
Water level |
||||||||
Localised by: ___________________________________ Date: ____________ |
Water-level data and levelling data
Site: ___________________________________________________________ Carried out by: __________________________________ Date: __________ |
||||||||
Well no. |
Reference point |
Water-level, |
Levelling data |
Notes |
||||
Water level |
Bottom |
Top of well casing (refe- |
Terrain |
Bottom |
Water level |
|||
Collection of soil samples
Site: ____________________________ Date: __________ Well no. ____________ Drilling contractor: ________________ Sample collector: ____________________ Drilling method: _____________________________________________________ Borehole diameter: ________________ Depth to water table: _________________ |
Soil-type description |
Odour-colour |
||||
Strata |
Description |
Sample |
Screen |
Description |
Sample |
|
- --2 - --4 - --6 - --8 - --1.0 - --2 - --4 - --6 - --8 - --9 - --2.0 - --2 - --4 - --6 - --8 - --3.0 - --2 - --4 - --6 - --8 - --4.0 - --2 - --4 - --6 - --8 - --5.0 - --2 - --4 - --6 - --8 - --6.0 |
|
|
- --2 - --4 - --6 - --8 - --1.0 - --2 - --4 - --6 - --8 - --9 - --2.0 - --2 - --4 - --6 - --8 - --3.0 - --2 - --4 - --6 - --8 - --4.0 - --2 - --4 - --6 - --8 - --5.0 - --2 - --4 - --6 - --8 - --6.0 |
|
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|||
|
|
|
|
||
|
|
|
|
||
|
|
|
|
||
|
|
|
|
||
|
|
|
|
||
|
|
|
|
||
|
|
|
|
||
|
|
|
|
||
|
|
|
|
Collection of water samples
Site:________________________________________________________________ Borehole diameter: __________________ Screen size:_______________________ Sampling method: ___________________ Collected by:______________________ |
||||||
Well no. |
Date |
Well bottom, m below reference point |
Water level, m below reference point |
Water column, litres |
Purge volume, litres |
Notes |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Collection of air samples
Soil analysis requisition form for laboratories
Water analysis requisition form for laboratories