Guidelines on remediation of contaminated sites

Figure 1
Principle for execution of soil gas measurement

 

a. The probe is driven to the desired depth, e.g. using a solid inner rod.
b. The probe is pulled up slightly, approximately 10 cm.
c. The measurement system is mounted at the top of the probe, allowing soil gas to be pumped up.